Solar power plant · Shelby, TN
Graceland Solar, LLC
Graceland Solar, LLC is a 150 MW solar power plant in Shelby County, Tennessee, operated by RWE Americas, LLC. Its oldest generator still running came online in 2026.
Graceland Solar, LLC in context
Among the 54 solar plants in Tennessee in the EIA's inventory, it is the 3rd largest, about 12% of the state's 1.2 GW of solar capacity.
Shelby County has 6 power plants of 1 MW or more with 1.6 GW in all; Graceland Solar, LLC is 10% of that and the largest of 5 solar plants there.
The average electricity customer in Shelby County goes 15 hours a year without power, the 1st most of 73 counties in Tennessee. The county's page has the full outage record.
Where it is
Graceland Solar, LLC (outlined) and other plants in Shelby County, shaded. 35.309, -89.866.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- TVA
- County
- Shelby County, TN
- EIA plant ID
- 66687
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GRA1 | Solar Photovoltaic | 150 MW | 2026 | – |
Nearby
Other plants in Shelby County
Questions
Graceland Solar, LLC, answered
How much power does Graceland Solar, LLC produce?
Graceland Solar, LLC has 150 MW of capacity from one generator. No full year of generation is reported yet.
Where is Graceland Solar, LLC?
Graceland Solar, LLC is in Shelby County, Tennessee, at about 35.309°, -89.866°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Shelby County goes 15 hours a year without power, the 1st most of 73 counties in Tennessee. The county's page has the full outage record.
Who operates Graceland Solar, LLC?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds the Tennessee Valley Authority.
When did Graceland Solar, LLC open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.