Solar power plant · Shelby, TN

SR Millington II

SR Millington II is a 75 MW solar power plant in Shelby County, Tennessee, operated by SR Millington II, LLC. Its oldest generator still running came online in 2026.

Capacity75 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

SR Millington II in context

Among the 54 solar plants in Tennessee in the EIA's inventory, it is the 6th largest, about 6.0% of the state's 1.2 GW of solar capacity.

Shelby County has 6 power plants of 1 MW or more with 1.6 GW in all; SR Millington II is 5% of that and the 2nd largest of 5 solar plants there.

The average electricity customer in Shelby County goes 15 hours a year without power, the 1st most of 73 counties in Tennessee. The county's page has the full outage record.

Where it is

SR Millington II (outlined) and other plants in Shelby County, shaded. 35.358, -89.846.

Plant facts

Operator
SR Millington II, LLC
Sector
IPP Non-CHP
Grid operator
TVA
County
Shelby County, TN
EIA plant ID
68326
Where Tennessee's power comes from → Tennessee power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MILL2 Solar Photovoltaic 75 MW 2026 –

Nearby

Other plants in Shelby County

Allen · 1.3 GWGraceland Solar, LLC · 150 MWMillington Solar Farm · 53 MWSR Innovation - NIKE PV · 1.5 MWIKEA Memphis 508 · 1.1 MW

Questions

SR Millington II, answered

How much power does SR Millington II produce?

SR Millington II has 75 MW of capacity from one generator. No full year of generation is reported yet.

Where is SR Millington II?

SR Millington II is in Shelby County, Tennessee, at about 35.358°, -89.846°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Shelby County goes 15 hours a year without power, the 1st most of 73 counties in Tennessee. The county's page has the full outage record.

Who operates SR Millington II?

It is operated by SR Millington II, LLC (EIA sector: IPP Non-CHP), and it feeds the Tennessee Valley Authority.

When did SR Millington II open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.