Solar power plant · Franklin, PA

Great Cove Solar II

Great Cove Solar II is a 150 MW solar power plant in Franklin County, Pennsylvania, operated by AES Clean Energy. Its oldest generator still running came online in 2023. In 2025 it generated 245 GWh, about what 24,000 average Pennsylvania homes use in a year.

Capacity150 MWNameplate, September 2026
Generated245 GWhIn 2025
Capacity factor19%Share of the most it could make, 2025
Generators1Oldest from 2023

Great Cove Solar II in context

Among the 82 solar plants in Pennsylvania in the EIA's inventory, it is the largest, about 12% of the state's 1.2 GW of solar capacity.

Franklin County has 14 power plants of 1 MW or more with 518 MW in all; Great Cove Solar II is 29% of that and the largest of 9 solar plants there.

Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Franklin County goes 2.2 hours a year without power, the 64th most of 67 counties in Pennsylvania. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0100200300202320242025GWh 245
0100200300202320242025245

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Great Cove Solar II (outlined) and other plants in Franklin County, shaded. 39.902, -77.868.

Plant facts

Operator
AES Clean Energy
Sector
IPP Non-CHP
Grid operator
PJM
County
Franklin County, PA
EIA plant ID
67137
Where Pennsylvania's power comes from → Pennsylvania power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GC2 Solar Photovoltaic 150 MW 2023 –

Questions

Great Cove Solar II, answered

How much power does Great Cove Solar II produce?

Great Cove Solar II has 150 MW of capacity from one generator. In 2025 it generated 245 GWh, 19% of the most it could have made running flat out all year (its capacity factor).

How many homes does Great Cove Solar II power?

Its 2025 output of 245 GWh equals the yearly electricity use of about 24,000 average Pennsylvania homes (839 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Great Cove Solar II?

Great Cove Solar II is in Franklin County, Pennsylvania, at about 39.902°, -77.868°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in Franklin County goes 2.2 hours a year without power, the 64th most of 67 counties in Pennsylvania. The county's page has the full outage record.

Who operates Great Cove Solar II?

It is operated by AES Clean Energy (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Great Cove Solar II open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Pennsylvania home's 839 kWh a month in 2025. Methodology.