Solar power plant · Jefferson, NY
Great Lakes Seaway Community Solar
Great Lakes Seaway Community Solar is a 10 MW solar power plant in Jefferson County, New York, operated by OYA Great Lakes Seaway LLC. Its oldest generator still running came online in 2019. In 2025 it generated 5.2 GWh, about what 739 average New York homes use in a year.
Great Lakes Seaway Community Solar in context
Among the 730 solar plants in New York in the EIA's inventory, it is the 24th largest, about 0.3% of the state's 3.2 GW of solar capacity.
Jefferson County has 33 power plants of 1 MW or more with 256 MW in all; Great Lakes Seaway Community Solar is 4% of that and the 3rd largest of 15 solar plants there.
Its capacity factor of 6% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Jefferson County goes 4.7 hours a year without power, the 41st most of 62 counties in New York. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Great Lakes Seaway Community Solar (outlined) and other plants in Jefferson County, shaded. 44.255, -76.012.
Plant facts
- Operator
- OYA Great Lakes Seaway LLC
- Sector
- IPP Non-CHP
- Grid operator
- NYIS
- County
- Jefferson County, NY
- EIA plant ID
- 64092
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GLSCS | Solar Photovoltaic | 5.0 MW | 2019 | – |
| GLSS | Batteries | 5.0 MW · 15 MWh | 2019 | – |
Nearby
Other plants in Jefferson County
Questions
Great Lakes Seaway Community Solar, answered
How much power does Great Lakes Seaway Community Solar produce?
Great Lakes Seaway Community Solar has 10 MW of capacity from 2 generators. In 2025 it generated 5.2 GWh, 6% of the most it could have made running flat out all year (its capacity factor).
How many homes does Great Lakes Seaway Community Solar power?
Its 2025 output of 5.2 GWh equals the yearly electricity use of about 739 average New York homes (586 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Great Lakes Seaway Community Solar?
Great Lakes Seaway Community Solar is in Jefferson County, New York, at about 44.255°, -76.012°. It is one of 33 power plants of 1 MW or more in the county. The average electricity customer in Jefferson County goes 4.7 hours a year without power, the 41st most of 62 counties in New York. The county's page has the full outage record.
Who operates Great Lakes Seaway Community Solar?
It is operated by OYA Great Lakes Seaway LLC (EIA sector: IPP Non-CHP), and it feeds the New York ISO.
When did Great Lakes Seaway Community Solar open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average New York home's 586 kWh a month in 2025. Methodology.