Solar power plant · Charlotte, FL

Green Pasture

Green Pasture is a 75 MW solar power plant in Charlotte County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2025. In 2025 it generated 189 GWh, about what 14,000 average Florida homes use in a year.

Capacity75 MWNameplate, September 2026
Generated189 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Green Pasture in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 137th largest, about 0.5% of the state's 14 GW of solar capacity.

Charlotte County has 4 power plants of 1 MW or more with 237 MW in all; Green Pasture is 32% of that and the 3rd largest of 3 solar plants there.

The average electricity customer in Charlotte County goes 22 hours a year without power, the 13th most of 67 counties in Florida. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Green Pasture (outlined) and other plants in Charlotte County, shaded. 27.023, -81.777.

Plant facts

Operator
Florida Power & Light Co
Sector
Electric Utility
Grid operator
FPL
County
Charlotte County, FL
EIA plant ID
65918
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 75 MW 2025 –

Nearby

Other plants in Charlotte County

Questions

Green Pasture, answered

How much power does Green Pasture produce?

Green Pasture has 75 MW of capacity from one generator. In 2025 it generated 189 GWh.

How many homes does Green Pasture power?

Its 2025 output of 189 GWh equals the yearly electricity use of about 14,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Green Pasture?

Green Pasture is in Charlotte County, Florida, at about 27.023°, -81.777°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Charlotte County goes 22 hours a year without power, the 13th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Green Pasture?

It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.

When did Green Pasture open?

Its oldest generator still running came online in 2025.