Wind power plant · Knox, TX
Green Pastures Wind II
Green Pastures Wind II is a 150 MW wind power plant in Knox County, Texas, operated by Green Pastures Wind II, LLC. Its oldest generator still running came online in 2015. In 2025 it generated 298 GWh, about what 22,000 average Texas homes use in a year.
Green Pastures Wind II in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 155th largest, about 0.3% of the state's 45 GW of wind capacity.
Knox County has 4 power plants of 1 MW or more with 954 MW in all; Green Pastures Wind II is 16% of that and the 4th largest of 4 wind plants there.
Its capacity factor of 23% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Knox County goes 12 hours a year without power, the 102nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Green Pastures Wind II (outlined) and other plants in Knox County, shaded. 33.646, -99.533.
Plant facts
- Operator
- Green Pastures Wind II, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Knox County, TX
- EIA plant ID
- 59733
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GPII | Onshore Wind Turbine | 150 MW | 2015 | – |
Nearby
Other plants in Knox County
Questions
Green Pastures Wind II, answered
How much power does Green Pastures Wind II produce?
Green Pastures Wind II has 150 MW of capacity from one generator. In 2025 it generated 298 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Green Pastures Wind II power?
Its 2025 output of 298 GWh equals the yearly electricity use of about 22,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Green Pastures Wind II?
Green Pastures Wind II is in Knox County, Texas, at about 33.646°, -99.533°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Knox County goes 12 hours a year without power, the 102nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Green Pastures Wind II?
It is operated by Green Pastures Wind II, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Green Pastures Wind II open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.