Solar power plant · Maricopa, AZ
Harquahala Sun Solar Project
Harquahala Sun Solar Project is a 150 MW solar power plant in Maricopa County, Arizona, operated by Copia Power. Its oldest generator still running came online in 2025. In 2025 it generated 317 GWh, about what 26,000 average Arizona homes use in a year.
Harquahala Sun Solar Project in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 23rd largest, about 1.5% of the state's 9.9 GW of solar capacity.
Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Harquahala Sun Solar Project is 1% of that and the 11th largest of 40 solar plants there.
The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Harquahala Sun Solar Project (outlined) and other plants in Maricopa County, shaded. 33.441, -113.135.
Plant facts
- Operator
- Copia Power
- Sector
- IPP Non-CHP
- Grid operator
- AZPS
- County
- Maricopa County, AZ
- EIA plant ID
- 66670
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| HARQ1 | Solar Photovoltaic | 150 MW | 2025 | – |
Questions
Harquahala Sun Solar Project, answered
How much power does Harquahala Sun Solar Project produce?
Harquahala Sun Solar Project has 150 MW of capacity from one generator. In 2025 it generated 317 GWh.
How many homes does Harquahala Sun Solar Project power?
Its 2025 output of 317 GWh equals the yearly electricity use of about 26,000 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Harquahala Sun Solar Project?
Harquahala Sun Solar Project is in Maricopa County, Arizona, at about 33.441°, -113.135°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Harquahala Sun Solar Project?
It is operated by Copia Power (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.
When did Harquahala Sun Solar Project open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.