Wind power plant · Benton, IN
Hoosier Wind Project LLC
Hoosier Wind Project LLC is a 106 MW wind power plant in Benton County, Indiana, operated by AES Indiana. Its oldest generator still running came online in 2009. In 2025 it generated 244 GWh, about what 22,000 average Indiana homes use in a year.
Hoosier Wind Project LLC in context
Among the 20 wind plants in Indiana in the EIA's inventory, it is the 15th largest, about 2.7% of the state's 3.9 GW of wind capacity.
Benton County has 5 power plants of 1 MW or more with 1.2 GW in all; Hoosier Wind Project LLC is 9% of that and the 5th largest of 5 wind plants there.
Its capacity factor of 26% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Benton County goes 4.4 hours a year without power, the 42nd most of 90 counties in Indiana. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hoosier Wind Project LLC (outlined) and other plants in Benton County, shaded. 40.718, -87.263.
Plant facts
- Operator
- AES Indiana
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Benton County, IN
- EIA plant ID
- 56878
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TBD | Onshore Wind Turbine | 106 MW | 2009 | – |
Nearby
Other plants in Benton County
Questions
Hoosier Wind Project LLC, answered
How much power does Hoosier Wind Project LLC produce?
Hoosier Wind Project LLC has 106 MW of capacity from one generator. In 2025 it generated 244 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hoosier Wind Project LLC power?
Its 2025 output of 244 GWh equals the yearly electricity use of about 22,000 average Indiana homes (938 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hoosier Wind Project LLC?
Hoosier Wind Project LLC is in Benton County, Indiana, at about 40.718°, -87.263°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Benton County goes 4.4 hours a year without power, the 42nd most of 90 counties in Indiana. The county's page has the full outage record.
Who operates Hoosier Wind Project LLC?
It is operated by AES Indiana (EIA sector: Electric Utility), and it feeds MISO.
When did Hoosier Wind Project LLC open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Indiana home's 938 kWh a month in 2025. Methodology.