Wind power plant · Benton, IN
Meadow Lake Wind Farm VI LLC
Meadow Lake Wind Farm VI LLC is a 200 MW wind power plant in Benton County, Indiana, operated by Meadow Lake Wind Farm VI LLC. Its oldest generator still running came online in 2018. In 2025 it generated 642 GWh, about what 57,000 average Indiana homes use in a year.
Meadow Lake Wind Farm VI LLC in context
Among the 20 wind plants in Indiana in the EIA's inventory, it is the 5th largest, about 5.2% of the state's 3.9 GW of wind capacity.
Benton County has 5 power plants of 1 MW or more with 1.2 GW in all; Meadow Lake Wind Farm VI LLC is 17% of that and the 2nd largest of 5 wind plants there.
Its capacity factor of 37% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Benton County goes 4.4 hours a year without power, the 42nd most of 90 counties in Indiana. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Meadow Lake Wind Farm VI LLC (outlined) and other plants in Benton County, shaded. 40.693, -87.127.
Plant facts
- Operator
- Meadow Lake Wind Farm VI LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Benton County, IN
- EIA plant ID
- 61756
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MWLVI | Onshore Wind Turbine | 200 MW | 2018 | – |
Nearby
Other plants in Benton County
Questions
Meadow Lake Wind Farm VI LLC, answered
How much power does Meadow Lake Wind Farm VI LLC produce?
Meadow Lake Wind Farm VI LLC has 200 MW of capacity from one generator. In 2025 it generated 642 GWh, 37% of the most it could have made running flat out all year (its capacity factor).
How many homes does Meadow Lake Wind Farm VI LLC power?
Its 2025 output of 642 GWh equals the yearly electricity use of about 57,000 average Indiana homes (938 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Meadow Lake Wind Farm VI LLC?
Meadow Lake Wind Farm VI LLC is in Benton County, Indiana, at about 40.693°, -87.127°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Benton County goes 4.4 hours a year without power, the 42nd most of 90 counties in Indiana. The county's page has the full outage record.
Who operates Meadow Lake Wind Farm VI LLC?
It is operated by Meadow Lake Wind Farm VI LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Meadow Lake Wind Farm VI LLC open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Indiana home's 938 kWh a month in 2025. Methodology.