Wind power plant · Bonneville, ID
Horse Butte Wind I, LLC
Horse Butte Wind I, LLC is a 58 MW wind power plant in Bonneville County, Idaho, operated by Utah Associated Mun Power Sys. Its oldest generator still running came online in 2012. In 2025 it generated 158 GWh, about what 14,000 average Idaho homes use in a year.
Horse Butte Wind I, LLC in context
Among the 33 wind plants in Idaho in the EIA's inventory, it is the 6th largest, about 5.1% of the state's 1.1 GW of wind capacity.
Bonneville County has 11 power plants of 1 MW or more with 611 MW in all; Horse Butte Wind I, LLC is 9% of that and the 4th largest of 4 wind plants there.
Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Bonneville County goes 1.8 hours a year without power, the 32nd most of 35 counties in Idaho. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Horse Butte Wind I, LLC (outlined) and other plants in Bonneville County, shaded. 43.386, -111.726.
Plant facts
- Operator
- Utah Associated Mun Power Sys
- Sector
- Electric Utility
- Grid operator
- BPAT
- County
- Bonneville County, ID
- EIA plant ID
- 57890
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 58 MW | 2012 | – |
Nearby
Other plants in Bonneville County
Questions
Horse Butte Wind I, LLC, answered
How much power does Horse Butte Wind I, LLC produce?
Horse Butte Wind I, LLC has 58 MW of capacity from one generator. In 2025 it generated 158 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Horse Butte Wind I, LLC power?
Its 2025 output of 158 GWh equals the yearly electricity use of about 14,000 average Idaho homes (933 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Horse Butte Wind I, LLC?
Horse Butte Wind I, LLC is in Bonneville County, Idaho, at about 43.386°, -111.726°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Bonneville County goes 1.8 hours a year without power, the 32nd most of 35 counties in Idaho. The county's page has the full outage record.
Who operates Horse Butte Wind I, LLC?
It is operated by Utah Associated Mun Power Sys (EIA sector: Electric Utility), and it feeds the Bonneville Power Administration.
When did Horse Butte Wind I, LLC open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Idaho home's 933 kWh a month in 2025. Methodology.