Intercession City
Intercession City is a 1.2 GW natural gas power plant in Osceola County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 1974. In 2025 it generated 194 GWh, about what 15,000 average Florida homes use in a year.
Intercession City in context
Among the 68 natural gas plants in Florida in the EIA's inventory, it is the 20th largest, about 2.1% of the state's 56 GW of natural gas capacity.
Osceola County has 8 power plants of 1 MW or more with 2.7 GW in all; Intercession City is 44% of that and the largest of 3 natural gas plants there.
Its capacity factor of 2% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Osceola County goes 2.5 hours a year without power, the 64th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Intercession City (outlined) and other plants in Osceola County, shaded. 28.263, -81.549.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Osceola County, FL
- EIA plant ID
- 8049
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| P11 | Petroleum Liquids | 149 MW | 1997 | – |
| P10 | Natural Gas Fired Combustion Turbine | 104 MW | 1993 | – |
| P7 | Natural Gas Fired Combustion Turbine | 104 MW | 1993 | – |
| P8 | Natural Gas Fired Combustion Turbine | 104 MW | 1993 | – |
| P9 | Natural Gas Fired Combustion Turbine | 104 MW | 1993 | – |
| P12 | Natural Gas Fired Combustion Turbine | 98 MW | 2000 | – |
| P13 | Natural Gas Fired Combustion Turbine | 98 MW | 2000 | – |
| P14 | Natural Gas Fired Combustion Turbine | 98 MW | 2000 | – |
| P1 | Petroleum Liquids | 57 MW | 1974 | – |
| P2 | Petroleum Liquids | 57 MW | 1974 | – |
| P3 | Petroleum Liquids | 57 MW | 1974 | – |
| P4 | Petroleum Liquids | 57 MW | 1974 | 2034 |
| P5 | Petroleum Liquids | 57 MW | 1974 | 2034 |
| P6 | Petroleum Liquids | 57 MW | 1974 | 2034 |
Nearby
Other plants in Osceola County
Questions
Intercession City, answered
How much power does Intercession City produce?
Intercession City has 1.2 GW of capacity from 14 generators. In 2025 it generated 194 GWh, 2% of the most it could have made running flat out all year (its capacity factor).
How many homes does Intercession City power?
Its 2025 output of 194 GWh equals the yearly electricity use of about 15,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Intercession City?
Intercession City is in Osceola County, Florida, at about 28.263°, -81.549°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Osceola County goes 2.5 hours a year without power, the 64th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Intercession City?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did Intercession City open?
Its oldest generator still running came online in 1974. Planned retirements are scheduled for 2034.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.