Wind power plant · Grundy, IA

Ivester Wind Farm

Ivester Wind Farm is a 91 MW wind power plant in Grundy County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2018. In 2025 it generated 328 GWh, about what 32,000 average Iowa homes use in a year.

Capacity91 MWNameplate, September 2026
Generated328 GWhIn 2025
Capacity factor41%Share of the most it could make, 2025
Generators1Oldest from 2018

Ivester Wind Farm in context

Among the 123 wind plants in Iowa in the EIA's inventory, it is the 60th largest, about 0.7% of the state's 13 GW of wind capacity.

Grundy County has 4 power plants of 1 MW or more with 243 MW in all; Ivester Wind Farm is 37% of that and the 2nd largest of 2 wind plants there.

Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Grundy County goes 6.0 hours a year without power, the 21st most of 98 counties in Iowa. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 328
01002003004005002019202120232025328

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Ivester Wind Farm (outlined) and other plants in Grundy County, shaded. 42.333, -92.946.

Plant facts

Operator
MidAmerican Energy Co
Sector
Electric Utility
Grid operator
MISO
County
Grundy County, IA
EIA plant ID
61911
Where Iowa's power comes from → Iowa power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WT1 Onshore Wind Turbine 91 MW 2018 –

Nearby

Other plants in Grundy County

Wellsburg Wind Project · 141 MWGrundy Center City Light Plant · 8.7 MWDike City Power Plant · 2.2 MW

Questions

Ivester Wind Farm, answered

How much power does Ivester Wind Farm produce?

Ivester Wind Farm has 91 MW of capacity from one generator. In 2025 it generated 328 GWh, 41% of the most it could have made running flat out all year (its capacity factor).

How many homes does Ivester Wind Farm power?

Its 2025 output of 328 GWh equals the yearly electricity use of about 32,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Ivester Wind Farm?

Ivester Wind Farm is in Grundy County, Iowa, at about 42.333°, -92.946°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Grundy County goes 6.0 hours a year without power, the 21st most of 98 counties in Iowa. The county's page has the full outage record.

Who operates Ivester Wind Farm?

It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.

When did Ivester Wind Farm open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.