Wind power plant · Grundy, IA
Ivester Wind Farm
Ivester Wind Farm is a 91 MW wind power plant in Grundy County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2018. In 2025 it generated 328 GWh, about what 32,000 average Iowa homes use in a year.
Ivester Wind Farm in context
Among the 123 wind plants in Iowa in the EIA's inventory, it is the 60th largest, about 0.7% of the state's 13 GW of wind capacity.
Grundy County has 4 power plants of 1 MW or more with 243 MW in all; Ivester Wind Farm is 37% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Grundy County goes 6.0 hours a year without power, the 21st most of 98 counties in Iowa. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Ivester Wind Farm (outlined) and other plants in Grundy County, shaded. 42.333, -92.946.
Plant facts
- Operator
- MidAmerican Energy Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Grundy County, IA
- EIA plant ID
- 61911
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | 91 MW | 2018 | – |
Nearby
Other plants in Grundy County
Questions
Ivester Wind Farm, answered
How much power does Ivester Wind Farm produce?
Ivester Wind Farm has 91 MW of capacity from one generator. In 2025 it generated 328 GWh, 41% of the most it could have made running flat out all year (its capacity factor).
How many homes does Ivester Wind Farm power?
Its 2025 output of 328 GWh equals the yearly electricity use of about 32,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Ivester Wind Farm?
Ivester Wind Farm is in Grundy County, Iowa, at about 42.333°, -92.946°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Grundy County goes 6.0 hours a year without power, the 21st most of 98 counties in Iowa. The county's page has the full outage record.
Who operates Ivester Wind Farm?
It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.
When did Ivester Wind Farm open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.