Wellsburg Wind Project is a 141 MW wind power plant in Grundy County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2014. In 2025 it generated 305 GWh, about what 30,000 average Iowa homes use in a year.
Wellsburg Wind Project in context
Among the 123 wind plants in Iowa in the EIA's inventory, it is the 45th largest, about 1.1% of the state's 13 GW of wind capacity.
Grundy County has 4 power plants of 1 MW or more with 243 MW in all; Wellsburg Wind Project is 58% of that and the largest of 2 wind plants there.
Its capacity factor of 25% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Grundy County goes 6.0 hours a year without power, the 21st most of 98 counties in Iowa. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Wellsburg Wind Project (outlined) and other plants in Grundy County, shaded. 42.391, -92.967.
Plant facts
- Operator
- MidAmerican Energy Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Grundy County, IA
- EIA plant ID
- 58886
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WBWF | Onshore Wind Turbine | 141 MW | 2014 | – |
Nearby
Other plants in Grundy County
Questions
Wellsburg Wind Project, answered
How much power does Wellsburg Wind Project produce?
Wellsburg Wind Project has 141 MW of capacity from one generator. In 2025 it generated 305 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Wellsburg Wind Project power?
Its 2025 output of 305 GWh equals the yearly electricity use of about 30,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Wellsburg Wind Project?
Wellsburg Wind Project is in Grundy County, Iowa, at about 42.391°, -92.967°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Grundy County goes 6.0 hours a year without power, the 21st most of 98 counties in Iowa. The county's page has the full outage record.
Who operates Wellsburg Wind Project?
It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.
When did Wellsburg Wind Project open?
Its oldest generator still running came online in 2014.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.