Biomass power plant · Anchorage, AK

JBER Landfill Gas Power Plant

JBER Landfill Gas Power Plant is a 12 MW biomass power plant in Anchorage Municipality, Alaska, operated by Doyon Utilities, LLC. Its oldest generator still running came online in 2012. In 2025 it generated 43 GWh, about what 6,300 average Alaska homes use in a year.

Capacity12 MWNameplate, September 2026
Generated43 GWhIn 2025
Capacity factor42%Share of the most it could make, 2025
Generators5Oldest from 2012

JBER Landfill Gas Power Plant in context

Among the 94 other-fuel plants in Alaska in the EIA's inventory, it is the 19th largest, about 1.4% of the state's 840 MW of other-fuel capacity.

Anchorage Municipality has 7 power plants of 1 MW or more with 869 MW in all; JBER Landfill Gas Power Plant is 1% of that.

Its capacity factor of 42% in 2025 is higher than the 25% typical for biomass plants across the US.

The average electricity customer in Anchorage Municipality goes 4.0 hours a year without power, the 6th most of 6 counties in Alaska. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0102030405020182019202020212022202320242025GWh 43
01020304050201920212023202543

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

JBER Landfill Gas Power Plant (outlined) and other plants in Anchorage Municipality, shaded. 61.286, -149.610.

Plant facts

Operator
Doyon Utilities, LLC
Sector
Commercial Non-CHP
County
Anchorage Municipality, AK
EIA plant ID
58380
Where Alaska's power comes from → Alaska power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Landfill Gas 2.3 MW 2012 –
2 Landfill Gas 2.3 MW 2012 –
3 Landfill Gas 2.3 MW 2012 –
4 Landfill Gas 2.3 MW 2012 –
5 Landfill Gas 2.3 MW 2013 –

Questions

JBER Landfill Gas Power Plant, answered

How much power does JBER Landfill Gas Power Plant produce?

JBER Landfill Gas Power Plant has 12 MW of capacity from 5 generators. In 2025 it generated 43 GWh, 42% of the most it could have made running flat out all year (its capacity factor).

How many homes does JBER Landfill Gas Power Plant power?

Its 2025 output of 43 GWh equals the yearly electricity use of about 6,300 average Alaska homes (564 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is JBER Landfill Gas Power Plant?

JBER Landfill Gas Power Plant is in Anchorage Municipality, Alaska, at about 61.286°, -149.610°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Anchorage Municipality goes 4.0 hours a year without power, the 6th most of 6 counties in Alaska. The county's page has the full outage record.

Who operates JBER Landfill Gas Power Plant?

It is operated by Doyon Utilities, LLC (EIA sector: Commercial Non-CHP).

When did JBER Landfill Gas Power Plant open?

Its oldest generator still running came online in 2012.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Alaska home's 564 kWh a month in 2025. Methodology.