Natural gas power plant · Anchorage, AK
Southcentral Power Project
Southcentral Power Project is a 204 MW natural gas power plant in Anchorage Municipality, Alaska, operated by Chugach Electric Assn Inc. Its oldest generator still running came online in 2013. In 2025 it generated 1.1 TWh, about what 158,000 average Alaska homes use in a year.
Southcentral Power Project in context
Among the 13 natural gas plants in Alaska in the EIA's inventory, it is the 3rd largest, about 14% of the state's 1.4 GW of natural gas capacity.
Anchorage Municipality has 7 power plants of 1 MW or more with 869 MW in all; Southcentral Power Project is 23% of that and the 2nd largest of 4 natural gas plants there.
Its capacity factor of 60% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Anchorage Municipality goes 4.0 hours a year without power, the 6th most of 6 counties in Alaska. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Southcentral Power Project (outlined) and other plants in Anchorage Municipality, shaded. 61.167, -149.905.
Plant facts
- Operator
- Chugach Electric Assn Inc
- Sector
- Electric Utility
- County
- Anchorage Municipality, AK
- EIA plant ID
- 57036
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 4 | Natural Gas Fired Combined Cycle | 58 MW | 2013 | – |
| 1 | Natural Gas Fired Combined Cycle | 49 MW | 2013 | – |
| 2 | Natural Gas Fired Combined Cycle | 49 MW | 2013 | – |
| 3 | Natural Gas Fired Combined Cycle | 49 MW | 2013 | – |
Questions
Southcentral Power Project, answered
How much power does Southcentral Power Project produce?
Southcentral Power Project has 204 MW of capacity from 4 generators. In 2025 it generated 1.1 TWh, 60% of the most it could have made running flat out all year (its capacity factor).
How many homes does Southcentral Power Project power?
Its 2025 output of 1.1 TWh equals the yearly electricity use of about 158,000 average Alaska homes (564 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Southcentral Power Project?
Southcentral Power Project is in Anchorage Municipality, Alaska, at about 61.167°, -149.905°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Anchorage Municipality goes 4.0 hours a year without power, the 6th most of 6 counties in Alaska. The county's page has the full outage record.
Who operates Southcentral Power Project?
It is operated by Chugach Electric Assn Inc (EIA sector: Electric Utility).
When did Southcentral Power Project open?
Its oldest generator still running came online in 2013.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Alaska home's 564 kWh a month in 2025. Methodology.