Solar power plant · Burlington, NJ
JMB Mcguire-Dix-Lakehurst Solar Project
JMB Mcguire-Dix-Lakehurst Solar Project is a 11 MW solar power plant in Burlington County, New Jersey, operated by Altus Power America Management, LLC. Its oldest generator still running came online in 2013. In 2025 it generated 11 GWh, about what 1,400 average New Jersey homes use in a year.
JMB Mcguire-Dix-Lakehurst Solar Project in context
Among the 352 solar plants in New Jersey in the EIA's inventory, it is the 15th largest, about 0.9% of the state's 1.3 GW of solar capacity.
Burlington County has 40 power plants of 1 MW or more with 429 MW in all; JMB Mcguire-Dix-Lakehurst Solar Project is 3% of that and the 2nd largest of 38 solar plants there.
Its capacity factor of 11% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Burlington County goes 6.7 hours a year without power, the 6th most of 21 counties in New Jersey. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
JMB Mcguire-Dix-Lakehurst Solar Project (outlined) and other plants in Burlington County, shaded. 39.993, -74.637.
Plant facts
- Operator
- Altus Power America Management, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Burlington County, NJ
- EIA plant ID
- 58793
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| UCIV | Solar Photovoltaic | 11 MW | 2013 | – |
Nearby
Other plants in Burlington County
Questions
JMB Mcguire-Dix-Lakehurst Solar Project, answered
How much power does JMB Mcguire-Dix-Lakehurst Solar Project produce?
JMB Mcguire-Dix-Lakehurst Solar Project has 11 MW of capacity from one generator. In 2025 it generated 11 GWh, 11% of the most it could have made running flat out all year (its capacity factor).
How many homes does JMB Mcguire-Dix-Lakehurst Solar Project power?
Its 2025 output of 11 GWh equals the yearly electricity use of about 1,400 average New Jersey homes (670 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is JMB Mcguire-Dix-Lakehurst Solar Project?
JMB Mcguire-Dix-Lakehurst Solar Project is in Burlington County, New Jersey, at about 39.993°, -74.637°. It is one of 40 power plants of 1 MW or more in the county. The average electricity customer in Burlington County goes 6.7 hours a year without power, the 6th most of 21 counties in New Jersey. The county's page has the full outage record.
Who operates JMB Mcguire-Dix-Lakehurst Solar Project?
It is operated by Altus Power America Management, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did JMB Mcguire-Dix-Lakehurst Solar Project open?
Its oldest generator still running came online in 2013.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New Jersey home's 670 kWh a month in 2025. Methodology.