Solar power plant · Sumter, FL
Jumper Creek Solar Plant
Jumper Creek Solar Plant is a 75 MW solar power plant in Sumter County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2026.
Jumper Creek Solar Plant in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 39th largest, about 0.5% of the state's 14 GW of solar capacity.
Sumter County has 2 power plants of 1 MW or more with 150 MW in all; Jumper Creek Solar Plant is 50% of that and the 2nd largest of 2 solar plants there.
The average electricity customer in Sumter County goes 3.4 hours a year without power, the 57th most of 67 counties in Florida. The county's page has the full outage record.
Where it is
Jumper Creek Solar Plant (outlined) and other plants in Sumter County, shaded. 28.955, -82.177.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Sumter County, FL
- EIA plant ID
- 69627
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| JCSP1 | Solar Photovoltaic | 75 MW | 2026 | – |
Nearby
Other plants in Sumter County
Questions
Jumper Creek Solar Plant, answered
How much power does Jumper Creek Solar Plant produce?
Jumper Creek Solar Plant has 75 MW of capacity from one generator. No full year of generation is reported yet.
Where is Jumper Creek Solar Plant?
Jumper Creek Solar Plant is in Sumter County, Florida, at about 28.955°, -82.177°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Sumter County goes 3.4 hours a year without power, the 57th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Jumper Creek Solar Plant?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did Jumper Creek Solar Plant open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.