Solar power plant · Sumter, FL

Jumper Creek Solar Plant

Jumper Creek Solar Plant is a 75 MW solar power plant in Sumter County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2026.

Capacity75 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Jumper Creek Solar Plant in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 39th largest, about 0.5% of the state's 14 GW of solar capacity.

Sumter County has 2 power plants of 1 MW or more with 150 MW in all; Jumper Creek Solar Plant is 50% of that and the 2nd largest of 2 solar plants there.

The average electricity customer in Sumter County goes 3.4 hours a year without power, the 57th most of 67 counties in Florida. The county's page has the full outage record.

Where it is

Jumper Creek Solar Plant (outlined) and other plants in Sumter County, shaded. 28.955, -82.177.

Plant facts

Operator
Duke Energy Florida, LLC
Sector
Electric Utility
Grid operator
FPC
County
Sumter County, FL
EIA plant ID
69627
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
JCSP1 Solar Photovoltaic 75 MW 2026 –

Nearby

Other plants in Sumter County

Questions

Jumper Creek Solar Plant, answered

How much power does Jumper Creek Solar Plant produce?

Jumper Creek Solar Plant has 75 MW of capacity from one generator. No full year of generation is reported yet.

Where is Jumper Creek Solar Plant?

Jumper Creek Solar Plant is in Sumter County, Florida, at about 28.955°, -82.177°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Sumter County goes 3.4 hours a year without power, the 57th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Jumper Creek Solar Plant?

It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.

When did Jumper Creek Solar Plant open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.