Solar power plant · Scott, MO

Kelso 2 Solar

Kelso 2 Solar is a 149 MW solar power plant in Scott County, Missouri, operated by Kelso 2 Solar, LLC. Its oldest generator still running came online in 2026.

Capacity149 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Kelso 2 Solar in context

Among the 38 solar plants in Missouri in the EIA's inventory, it is the 7th largest, about 7.9% of the state's 1.9 GW of solar capacity.

Scott County has 3 power plants of 1 MW or more with 610 MW in all; Kelso 2 Solar is 24% of that and the 2nd largest of 2 solar plants there.

The average electricity customer in Scott County goes 2.5 hours a year without power, the 89th most of 110 counties in Missouri. The county's page has the full outage record.

Where it is

Kelso 2 Solar (outlined) and other plants in Scott County, shaded. 37.050, -89.520.

Plant facts

Operator
Kelso 2 Solar, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Scott County, MO
EIA plant ID
69321
Where Missouri's power comes from → Missouri power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
KLSO2 Solar Photovoltaic 149 MW 2026 –

Nearby

Other plants in Scott County

Questions

Kelso 2 Solar, answered

How much power does Kelso 2 Solar produce?

Kelso 2 Solar has 149 MW of capacity from one generator. No full year of generation is reported yet.

Where is Kelso 2 Solar?

Kelso 2 Solar is in Scott County, Missouri, at about 37.050°, -89.520°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Scott County goes 2.5 hours a year without power, the 89th most of 110 counties in Missouri. The county's page has the full outage record.

Who operates Kelso 2 Solar?

It is operated by Kelso 2 Solar, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Kelso 2 Solar open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.