Solar power plant · Scott, MO

Kelso Solar

Kelso Solar is a 200 MW solar power plant in Scott County, Missouri, operated by Kelso Solar, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 13 GWh, about what 1,000 average Missouri homes use in a year.

Capacity200 MWNameplate, September 2026
Generated13 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Kelso Solar in context

Among the 38 solar plants in Missouri in the EIA's inventory, it is the 5th largest, about 11% of the state's 1.9 GW of solar capacity.

Scott County has 3 power plants of 1 MW or more with 610 MW in all; Kelso Solar is 33% of that and the largest of 2 solar plants there.

The average electricity customer in Scott County goes 2.5 hours a year without power, the 89th most of 110 counties in Missouri. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Kelso Solar (outlined) and other plants in Scott County, shaded. 37.050, -89.520.

Plant facts

Operator
Kelso Solar, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Scott County, MO
EIA plant ID
69319
Where Missouri's power comes from → Missouri power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
KLSO1 Solar Photovoltaic 200 MW 2025 –

Nearby

Other plants in Scott County

Questions

Kelso Solar, answered

How much power does Kelso Solar produce?

Kelso Solar has 200 MW of capacity from one generator. In 2025 it generated 13 GWh.

How many homes does Kelso Solar power?

Its 2025 output of 13 GWh equals the yearly electricity use of about 1,000 average Missouri homes (1,037 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Kelso Solar?

Kelso Solar is in Scott County, Missouri, at about 37.050°, -89.520°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Scott County goes 2.5 hours a year without power, the 89th most of 110 counties in Missouri. The county's page has the full outage record.

Who operates Kelso Solar?

It is operated by Kelso Solar, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Kelso Solar open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Missouri home's 1,037 kWh a month in 2025. Methodology.