Wind power plant · Parmer, TX
Lazbuddie Wind Energy LLC
Lazbuddie Wind Energy LLC is a 265 MW wind power plant in Parmer County, Texas, operated by Public Service Co of Oklahoma. Its oldest generator still running came online in 2026.
Lazbuddie Wind Energy LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 45th largest, about 0.6% of the state's 45 GW of wind capacity.
Parmer County has 2 power plants of 1 MW or more with 495 MW in all; Lazbuddie Wind Energy LLC is 53% of that and the largest of 2 wind plants there.
The average electricity customer in Parmer County goes 6.8 hours a year without power, the 171st most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Lazbuddie Wind Energy LLC (outlined) and other plants in Parmer County, shaded. 34.559, -102.683.
Plant facts
- Operator
- Public Service Co of Oklahoma
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Parmer County, TX
- EIA plant ID
- 69478
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| LZBDE | Onshore Wind Turbine | 265 MW | 2026 | – |
Nearby
Other plants in Parmer County
Questions
Lazbuddie Wind Energy LLC, answered
How much power does Lazbuddie Wind Energy LLC produce?
Lazbuddie Wind Energy LLC has 265 MW of capacity from one generator. No full year of generation is reported yet.
Where is Lazbuddie Wind Energy LLC?
Lazbuddie Wind Energy LLC is in Parmer County, Texas, at about 34.559°, -102.683°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Parmer County goes 6.8 hours a year without power, the 171st most of 240 counties in Texas. The county's page has the full outage record.
Who operates Lazbuddie Wind Energy LLC?
It is operated by Public Service Co of Oklahoma (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Lazbuddie Wind Energy LLC open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.