Wind power plant · Parmer, TX
Mariah del Norte
Mariah del Norte is a 230 MW wind power plant in Parmer County, Texas, operated by BHE Renewables, LLC. Its oldest generator still running came online in 2016. In 2025 it generated 841 GWh, about what 63,000 average Texas homes use in a year.
Mariah del Norte in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 64th largest, about 0.5% of the state's 45 GW of wind capacity.
Parmer County has 2 power plants of 1 MW or more with 495 MW in all; Mariah del Norte is 47% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 42% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Parmer County goes 6.8 hours a year without power, the 171st most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mariah del Norte (outlined) and other plants in Parmer County, shaded. 34.667, -102.578.
Plant facts
- Operator
- BHE Renewables, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Parmer County, TX
- EIA plant ID
- 59005
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MAR1 | Onshore Wind Turbine | 230 MW | 2016 | – |
Nearby
Other plants in Parmer County
Questions
Mariah del Norte, answered
How much power does Mariah del Norte produce?
Mariah del Norte has 230 MW of capacity from one generator. In 2025 it generated 841 GWh, 42% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mariah del Norte power?
Its 2025 output of 841 GWh equals the yearly electricity use of about 63,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mariah del Norte?
Mariah del Norte is in Parmer County, Texas, at about 34.667°, -102.578°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Parmer County goes 6.8 hours a year without power, the 171st most of 240 counties in Texas. The county's page has the full outage record.
Who operates Mariah del Norte?
It is operated by BHE Renewables, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Mariah del Norte open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.