Solar power plant · Harris, TX
Liberty Hybrid Solar and Storage Project
Liberty Hybrid Solar and Storage Project is a 132 MW solar power plant in Harris County, Texas, operated by Liberty 1 Solar LLC. Its oldest generator still running came online in 2025. In 2025 it generated 53 GWh, about what 4,000 average Texas homes use in a year.
Liberty Hybrid Solar and Storage Project in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 124th largest, about 0.4% of the state's 37 GW of solar capacity.
Harris County has 86 power plants of 1 MW or more with 11 GW in all; Liberty Hybrid Solar and Storage Project is 1% of that and the largest of 3 solar plants there.
The average electricity customer in Harris County goes 16 hours a year without power, the 66th most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Liberty Hybrid Solar and Storage Project (outlined) and other plants in Harris County, shaded. 30.010, -95.041.
Plant facts
- Operator
- Liberty 1 Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Harris County, TX
- EIA plant ID
- 67867
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| LIB1 | Solar Photovoltaic | 67 MW | 2025 | – |
| LIB2 | Batteries | 65 MW · 62 MWh | 2026 | – |
Questions
Liberty Hybrid Solar and Storage Project, answered
How much power does Liberty Hybrid Solar and Storage Project produce?
Liberty Hybrid Solar and Storage Project has 132 MW of capacity from 2 generators. In 2025 it generated 53 GWh.
How many homes does Liberty Hybrid Solar and Storage Project power?
Its 2025 output of 53 GWh equals the yearly electricity use of about 4,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Liberty Hybrid Solar and Storage Project?
Liberty Hybrid Solar and Storage Project is in Harris County, Texas, at about 30.010°, -95.041°. It is one of 86 power plants of 1 MW or more in the county. The average electricity customer in Harris County goes 16 hours a year without power, the 66th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Liberty Hybrid Solar and Storage Project?
It is operated by Liberty 1 Solar LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Liberty Hybrid Solar and Storage Project open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.