Liggett Switch is a 10 MW storage power plant in Tarrant County, Texas, operated by Prologis Logistics Services Incorporated BESS. Its oldest generator still running came online in 2024.
Liggett Switch in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 130th largest, about 0.1% of the state's 16 GW of storage capacity.
Tarrant County has 26 power plants of 1 MW or more with 1.5 GW in all; Liggett Switch is 1% of that and the 3rd largest of 4 storage plants there.
The average electricity customer in Tarrant County goes 5.4 hours a year without power, the 192nd most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Liggett Switch (outlined) and other plants in Tarrant County, shaded. 32.815, -97.025.
Plant facts
- Operator
- Prologis Logistics Services Incorporated BESS
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Tarrant County, TX
- EIA plant ID
- 68685
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| DL745 | Batteries | 10 MW · 12 MWh | 2024 | – |
Nearby
Other plants in Tarrant County
Questions
Liggett Switch, answered
How much can Liggett Switch store and deliver?
Liggett Switch can deliver up to 10 MW and hold 12 MWh of energy, from one battery or storage system. Its net energy in 2025 was -0.6 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Liggett Switch?
Liggett Switch is in Tarrant County, Texas, at about 32.815°, -97.025°. It is one of 26 power plants of 1 MW or more in the county. The average electricity customer in Tarrant County goes 5.4 hours a year without power, the 192nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Liggett Switch?
It is operated by Prologis Logistics Services Incorporated BESS (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Liggett Switch open?
Its oldest generator still running came online in 2024.