Wind power plant · Crosby, TX
Lorenzo Wind
Lorenzo Wind is a 80 MW wind power plant in Crosby County, Texas, operated by Lorenzo Wind, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 338 GWh, about what 25,000 average Texas homes use in a year.
Lorenzo Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 200th largest, about 0.2% of the state's 45 GW of wind capacity.
Crosby County has 4 power plants of 1 MW or more with 367 MW in all; Lorenzo Wind is 22% of that and the 2nd largest of 4 wind plants there.
Its capacity factor of 48% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Crosby County goes 16 hours a year without power, the 59th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Lorenzo Wind (outlined) and other plants in Crosby County, shaded. 33.699, -101.525.
Plant facts
- Operator
- Lorenzo Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Crosby County, TX
- EIA plant ID
- 59244
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| FIBE1 | Onshore Wind Turbine | 80 MW | 2018 | – |
Nearby
Other plants in Crosby County
Questions
Lorenzo Wind, answered
How much power does Lorenzo Wind produce?
Lorenzo Wind has 80 MW of capacity from one generator. In 2025 it generated 338 GWh, 48% of the most it could have made running flat out all year (its capacity factor).
How many homes does Lorenzo Wind power?
Its 2025 output of 338 GWh equals the yearly electricity use of about 25,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Lorenzo Wind?
Lorenzo Wind is in Crosby County, Texas, at about 33.699°, -101.525°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Crosby County goes 16 hours a year without power, the 59th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Lorenzo Wind?
It is operated by Lorenzo Wind, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Lorenzo Wind open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.