Wind power plant · Crosby, TX

Lorenzo Wind

Lorenzo Wind is a 80 MW wind power plant in Crosby County, Texas, operated by Lorenzo Wind, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 338 GWh, about what 25,000 average Texas homes use in a year.

Capacity80 MWNameplate, September 2026
Generated338 GWhIn 2025
Capacity factor48%Share of the most it could make, 2025
Generators1Oldest from 2018

Lorenzo Wind in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 200th largest, about 0.2% of the state's 45 GW of wind capacity.

Crosby County has 4 power plants of 1 MW or more with 367 MW in all; Lorenzo Wind is 22% of that and the 2nd largest of 4 wind plants there.

Its capacity factor of 48% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Crosby County goes 16 hours a year without power, the 59th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 338
01002003004005002019202120232025338

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Lorenzo Wind (outlined) and other plants in Crosby County, shaded. 33.699, -101.525.

Plant facts

Operator
Lorenzo Wind, LLC
Sector
IPP Non-CHP
Grid operator
SWPP
County
Crosby County, TX
EIA plant ID
59244
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
FIBE1 Onshore Wind Turbine 80 MW 2018 –

Questions

Lorenzo Wind, answered

How much power does Lorenzo Wind produce?

Lorenzo Wind has 80 MW of capacity from one generator. In 2025 it generated 338 GWh, 48% of the most it could have made running flat out all year (its capacity factor).

How many homes does Lorenzo Wind power?

Its 2025 output of 338 GWh equals the yearly electricity use of about 25,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Lorenzo Wind?

Lorenzo Wind is in Crosby County, Texas, at about 33.699°, -101.525°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Crosby County goes 16 hours a year without power, the 59th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Lorenzo Wind?

It is operated by Lorenzo Wind, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.

When did Lorenzo Wind open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.