Wind power plant · Crosby, TX
Ralls Wind Farm
Ralls Wind Farm is a 10 MW wind power plant in Crosby County, Texas, operated by Ralls Wind Farm LLC. Its oldest generator still running came online in 2011. In 2025 it generated 7.7 GWh, about what 578 average Texas homes use in a year.
Ralls Wind Farm in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 227th largest, about 0.0% of the state's 45 GW of wind capacity.
Crosby County has 4 power plants of 1 MW or more with 367 MW in all; Ralls Wind Farm is 3% of that and the 4th largest of 4 wind plants there.
Its capacity factor of 9% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Crosby County goes 16 hours a year without power, the 59th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Ralls Wind Farm (outlined) and other plants in Crosby County, shaded. 33.661, -101.390.
Plant facts
- Operator
- Ralls Wind Farm LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Crosby County, TX
- EIA plant ID
- 57474
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 10 MW | 2011 | – |
Nearby
Other plants in Crosby County
Questions
Ralls Wind Farm, answered
How much power does Ralls Wind Farm produce?
Ralls Wind Farm has 10 MW of capacity from one generator. In 2025 it generated 7.7 GWh, 9% of the most it could have made running flat out all year (its capacity factor).
How many homes does Ralls Wind Farm power?
Its 2025 output of 7.7 GWh equals the yearly electricity use of about 578 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Ralls Wind Farm?
Ralls Wind Farm is in Crosby County, Texas, at about 33.661°, -101.390°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Crosby County goes 16 hours a year without power, the 59th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Ralls Wind Farm?
It is operated by Ralls Wind Farm LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Ralls Wind Farm open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.