Storage power plant · Hidalgo, TX
Madero Grid
Madero Grid is a 100 MW storage power plant in Hidalgo County, Texas, operated by Madero Grid, LLC. Its oldest generator still running came online in 2023.
Madero Grid in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 67th largest, about 0.6% of the state's 16 GW of storage capacity.
Hidalgo County has 30 power plants of 1 MW or more with 3.4 GW in all; Madero Grid is 3% of that and the 2nd largest of 16 storage plants there.
The average electricity customer in Hidalgo County goes 4.6 hours a year without power, the 202nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Madero Grid (outlined) and other plants in Hidalgo County, shaded. 26.170, -98.330.
Plant facts
- Operator
- Madero Grid, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Hidalgo County, TX
- EIA plant ID
- 63757
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MAD01 | Batteries | 100 MW · 100 MWh | 2023 | 2042 |
Questions
Madero Grid, answered
How much can Madero Grid store and deliver?
Madero Grid can deliver up to 100 MW and hold 100 MWh of energy, from one battery or storage system. Its net energy in 2025 was -14.9 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Madero Grid?
Madero Grid is in Hidalgo County, Texas, at about 26.170°, -98.330°. It is one of 30 power plants of 1 MW or more in the county. The average electricity customer in Hidalgo County goes 4.6 hours a year without power, the 202nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Madero Grid?
It is operated by Madero Grid, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Madero Grid open?
Its oldest generator still running came online in 2023. Planned retirements are scheduled for 2042.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Methodology.