Wind power plant · Hidalgo, TX
Monte Cristo 1
Monte Cristo 1 is a 239 MW wind power plant in Hidalgo County, Texas, operated by Terra-Gen Operating Co-Wind. Its oldest generator still running came online in 2025. In 2025 it generated 168 GWh, about what 13,000 average Texas homes use in a year.
Monte Cristo 1 in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 60th largest, about 0.5% of the state's 45 GW of wind capacity.
Hidalgo County has 30 power plants of 1 MW or more with 3.4 GW in all; Monte Cristo 1 is 7% of that and the 2nd largest of 3 wind plants there.
The average electricity customer in Hidalgo County goes 4.6 hours a year without power, the 202nd most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Monte Cristo 1 (outlined) and other plants in Hidalgo County, shaded. 26.461, -98.286.
Plant facts
- Operator
- Terra-Gen Operating Co-Wind
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Hidalgo County, TX
- EIA plant ID
- 67875
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 239 MW | 2025 | – |
Questions
Monte Cristo 1, answered
How much power does Monte Cristo 1 produce?
Monte Cristo 1 has 239 MW of capacity from one generator. In 2025 it generated 168 GWh.
How many homes does Monte Cristo 1 power?
Its 2025 output of 168 GWh equals the yearly electricity use of about 13,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Monte Cristo 1?
Monte Cristo 1 is in Hidalgo County, Texas, at about 26.461°, -98.286°. It is one of 30 power plants of 1 MW or more in the county. The average electricity customer in Hidalgo County goes 4.6 hours a year without power, the 202nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Monte Cristo 1?
It is operated by Terra-Gen Operating Co-Wind (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Monte Cristo 1 open?
Its oldest generator still running came online in 2025.