Solar power plant · Henderson, TX
Malakoff Solar Project
Malakoff Solar Project is a 10 MW solar power plant in Henderson County, Texas, operated by Ellomay USA Inc. Its oldest generator still running came online in 2025. In 2025 it generated 16 GWh, about what 1,200 average Texas homes use in a year.
Malakoff Solar Project in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 199th largest, about 0.0% of the state's 37 GW of solar capacity.
Henderson County has 4 power plants of 1 MW or more with 546 MW in all; Malakoff Solar Project is 2% of that.
The average electricity customer in Henderson County goes 8.8 hours a year without power, the 130th most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Malakoff Solar Project (outlined) and other plants in Henderson County, shaded. 32.183, -96.018.
Plant facts
- Operator
- Ellomay USA Inc
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Henderson County, TX
- EIA plant ID
- 69261
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MLKF1 | Solar Photovoltaic | 5.0 MW | 2025 | – |
| MLKF2 | Solar Photovoltaic | 5.0 MW | 2025 | – |
Nearby
Other plants in Henderson County
Questions
Malakoff Solar Project, answered
How much power does Malakoff Solar Project produce?
Malakoff Solar Project has 10 MW of capacity from 2 generators. In 2025 it generated 16 GWh.
How many homes does Malakoff Solar Project power?
Its 2025 output of 16 GWh equals the yearly electricity use of about 1,200 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Malakoff Solar Project?
Malakoff Solar Project is in Henderson County, Texas, at about 32.183°, -96.018°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Henderson County goes 8.8 hours a year without power, the 130th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Malakoff Solar Project?
It is operated by Ellomay USA Inc (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Malakoff Solar Project open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.