Storage power plant · Henderson, TX
Tanzanite Storage
Tanzanite Storage is a 283 MW storage power plant in Henderson County, Texas, operated by Tanzanite Energy Storage LLC. Its oldest generator still running came online in 2025.
Tanzanite Storage in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 8th largest, about 1.7% of the state's 16 GW of storage capacity.
Henderson County has 4 power plants of 1 MW or more with 546 MW in all; Tanzanite Storage is 52% of that and the largest of 2 storage plants there.
The average electricity customer in Henderson County goes 8.8 hours a year without power, the 130th most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Tanzanite Storage (outlined) and other plants in Henderson County, shaded. 32.231, -95.838.
Plant facts
- Operator
- Tanzanite Energy Storage LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Henderson County, TX
- EIA plant ID
- 69026
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TANZ | Batteries | 283 MW · 283 MWh | 2025 | – |
Nearby
Other plants in Henderson County
Questions
Tanzanite Storage, answered
How much can Tanzanite Storage store and deliver?
Tanzanite Storage can deliver up to 283 MW and hold 283 MWh of energy, from one battery or storage system. Its net energy in 2025 was -5.1 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Tanzanite Storage?
Tanzanite Storage is in Henderson County, Texas, at about 32.231°, -95.838°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Henderson County goes 8.8 hours a year without power, the 130th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Tanzanite Storage?
It is operated by Tanzanite Energy Storage LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Tanzanite Storage open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.