Solar power plant · Maricopa, AZ

Maricopa Solar

Maricopa Solar is a 550 MW solar power plant in Maricopa County, Arizona, operated by Maricopa Solar. Its oldest generator still running came online in 2026.

Capacity550 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Maricopa Solar in context

Among the 109 solar plants in Arizona in the EIA's inventory, it is the 5th largest, about 5.6% of the state's 9.9 GW of solar capacity.

Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Maricopa Solar is 2% of that and the 3rd largest of 40 solar plants there.

The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.

Where it is

Maricopa Solar (outlined) and other plants in Maricopa County, shaded. 33.463, -113.110.

Plant facts

Operator
Maricopa Solar
Sector
IPP Non-CHP
Grid operator
AZPS
County
Maricopa County, AZ
EIA plant ID
69684
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
70124 Solar Photovoltaic 550 MW 2026 –

Planned

GeneratorTechnologyCapacityExpected
70125Batteries550 MW2026

Questions

Maricopa Solar, answered

How much power does Maricopa Solar produce?

Maricopa Solar has 550 MW of capacity from one generator. No full year of generation is reported yet.

Where is Maricopa Solar?

Maricopa Solar is in Maricopa County, Arizona, at about 33.463°, -113.110°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Maricopa Solar?

It is operated by Maricopa Solar (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.

When did Maricopa Solar open?

Its oldest generator still running came online in 2026. 1 more generator is planned.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.