Natural gas power plant · Maricopa, AZ
Mesquite Generating Station Block 2
Mesquite Generating Station Block 2 is a 692 MW natural gas power plant in Maricopa County, Arizona, operated by Mesquite Power LLC. Its oldest generator still running came online in 2003. In 2025 it generated 4.0 TWh, about what 320,000 average Arizona homes use in a year.
Mesquite Generating Station Block 2 in context
Among the 33 natural gas plants in Arizona in the EIA's inventory, it is the 13th largest, about 3.8% of the state's 18 GW of natural gas capacity.
Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Mesquite Generating Station Block 2 is 3% of that and the 8th largest of 15 natural gas plants there.
Its capacity factor of 65% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mesquite Generating Station Block 2 (outlined) and other plants in Maricopa County, shaded. 33.345, -112.864.
Plant facts
- Operator
- Mesquite Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- SRP
- County
- Maricopa County, AZ
- EIA plant ID
- 55481
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ST2 | Natural Gas Fired Combined Cycle | 321 MW | 2003 | – |
| GT3 | Natural Gas Fired Combined Cycle | 185 MW | 2003 | – |
| GT4 | Natural Gas Fired Combined Cycle | 185 MW | 2003 | – |
Questions
Mesquite Generating Station Block 2, answered
How much power does Mesquite Generating Station Block 2 produce?
Mesquite Generating Station Block 2 has 692 MW of capacity from 3 generators. In 2025 it generated 4.0 TWh, 65% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mesquite Generating Station Block 2 power?
Its 2025 output of 4.0 TWh equals the yearly electricity use of about 320,000 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mesquite Generating Station Block 2?
Mesquite Generating Station Block 2 is in Maricopa County, Arizona, at about 33.345°, -112.864°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Mesquite Generating Station Block 2?
It is operated by Mesquite Power LLC (EIA sector: IPP Non-CHP), and it feeds Salt River Project.
When did Mesquite Generating Station Block 2 open?
Its oldest generator still running came online in 2003.