Solar power plant · Maricopa, AZ
Mesquite Solar 1
Mesquite Solar 1 is a 170 MW solar power plant in Maricopa County, Arizona, operated by RWE Americas, LLC. Its oldest generator still running came online in 2011. In 2025 it generated 392 GWh, about what 32,000 average Arizona homes use in a year.
Mesquite Solar 1 in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 16th largest, about 1.7% of the state's 9.9 GW of solar capacity.
Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Mesquite Solar 1 is 1% of that and the 6th largest of 40 solar plants there.
Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mesquite Solar 1 (outlined) and other plants in Maricopa County, shaded. 33.342, -112.904.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Maricopa County, AZ
- EIA plant ID
- 57707
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 16 MW | 2011 | – |
| 11 | Solar Photovoltaic | 16 MW | 2012 | – |
| 12 | Solar Photovoltaic | 16 MW | 2012 | – |
| 2 | Solar Photovoltaic | 16 MW | 2012 | – |
| 4 | Solar Photovoltaic | 16 MW | 2012 | – |
| 5 | Solar Photovoltaic | 16 MW | 2012 | – |
| 7 | Solar Photovoltaic | 16 MW | 2012 | – |
| 9 | Solar Photovoltaic | 16 MW | 2012 | – |
| 10 | Solar Photovoltaic | 12 MW | 2012 | – |
| 8 | Solar Photovoltaic | 12 MW | 2012 | – |
| 3 | Solar Photovoltaic | 10 MW | 2011 | – |
| 6 | Solar Photovoltaic | 8.0 MW | 2012 | – |
Questions
Mesquite Solar 1, answered
How much power does Mesquite Solar 1 produce?
Mesquite Solar 1 has 170 MW of capacity from 12 generators. In 2025 it generated 392 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mesquite Solar 1 power?
Its 2025 output of 392 GWh equals the yearly electricity use of about 32,000 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mesquite Solar 1?
Mesquite Solar 1 is in Maricopa County, Arizona, at about 33.342°, -112.904°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Mesquite Solar 1?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Mesquite Solar 1 open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.