Other power plant · Polk, FL
Mosaic New Wales Operations
Mosaic New Wales Operations is a 136 MW other power plant in Polk County, Florida, operated by Mosaic Fertilizer LLC. Its oldest generator still running came online in 1981. In 2025 it generated 366 GWh, about what 28,000 average Florida homes use in a year.
Mosaic New Wales Operations in context
Among the 40 other-fuel plants in Florida in the EIA's inventory, it is the 3rd largest, about 5.1% of the state's 2.6 GW of other-fuel capacity.
Polk County has 29 power plants of 1 MW or more with 6.7 GW in all; Mosaic New Wales Operations is 2% of that and the largest of 4 other plants there.
Its capacity factor of 31% in 2025 is higher than the 25% typical for other plants across the US.
The average electricity customer in Polk County goes 9.9 hours a year without power, the 33rd most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mosaic New Wales Operations (outlined) and other plants in Polk County, shaded. 27.834, -82.052.
Plant facts
- Operator
- Mosaic Fertilizer LLC
- Sector
- Industrial CHP
- Grid operator
- TEC
- County
- Polk County, FL
- EIA plant ID
- 10434
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TG2 | All Other | 59 MW | 1984 | – |
| TG4 | All Other | 35 MW | 2014 | – |
| TG3 | All Other | 32 MW | 1982 | – |
| TG1 | All Other | 10 MW | 1981 | – |
Questions
Mosaic New Wales Operations, answered
How much power does Mosaic New Wales Operations produce?
Mosaic New Wales Operations has 136 MW of capacity from 4 generators. In 2025 it generated 366 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mosaic New Wales Operations power?
Its 2025 output of 366 GWh equals the yearly electricity use of about 28,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mosaic New Wales Operations?
Mosaic New Wales Operations is in Polk County, Florida, at about 27.834°, -82.052°. It is one of 29 power plants of 1 MW or more in the county. The average electricity customer in Polk County goes 9.9 hours a year without power, the 33rd most of 67 counties in Florida. The county's page has the full outage record.
Who operates Mosaic New Wales Operations?
It is operated by Mosaic Fertilizer LLC (EIA sector: Industrial CHP), and it feeds balancing authority TEC.
When did Mosaic New Wales Operations open?
Its oldest generator still running came online in 1981.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.