Solar power plant · Morris, NJ

Mount Olive Solar Farm

Mount Olive Solar Farm is a 20 MW solar power plant in Morris County, New Jersey, operated by NJR Clean Energy Ventures Corporation. Its oldest generator still running came online in 2023. In 2025 it generated 32 GWh, about what 3,900 average New Jersey homes use in a year.

Capacity20 MWNameplate, September 2026
Generated32 GWhIn 2025
Capacity factor18%Share of the most it could make, 2025
Generators1Oldest from 2023

Mount Olive Solar Farm in context

Among the 352 solar plants in New Jersey in the EIA's inventory, it is the 4th largest, about 1.5% of the state's 1.3 GW of solar capacity.

Morris County has 17 power plants of 1 MW or more with 71 MW in all; Mount Olive Solar Farm is 28% of that and the largest of 15 solar plants there.

Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Morris County goes 14 hours a year without power, the 4th most of 21 counties in New Jersey. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010203040202320242025GWh 32
01020304020232024202532

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Mount Olive Solar Farm (outlined) and other plants in Morris County, shaded. 40.881, -74.699.

Plant facts

Operator
NJR Clean Energy Ventures Corporation
Sector
IPP Non-CHP
Grid operator
PJM
County
Morris County, NJ
EIA plant ID
65348
Where New Jersey's power comes from → New Jersey power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
OLIVE Solar Photovoltaic 20 MW 2023 –

Nearby

Other plants in Morris County

Parker Road Solar · 15 MWMorristown Medical Center · 4.6 MWToys R Us- DE, Inc. at Mt. Olive, NJ · 4.1 MWNorth Jersey Media Group Solar Facility · 4.1 MWCounty College of Morris · 2.9 MWEmerald Kemble, LLC · 2.4 MWCitrine NJ - West Pkwy · 2.3 MWMount Olive Solar 3 LLC · 2.2 MW

Questions

Mount Olive Solar Farm, answered

How much power does Mount Olive Solar Farm produce?

Mount Olive Solar Farm has 20 MW of capacity from one generator. In 2025 it generated 32 GWh, 18% of the most it could have made running flat out all year (its capacity factor).

How many homes does Mount Olive Solar Farm power?

Its 2025 output of 32 GWh equals the yearly electricity use of about 3,900 average New Jersey homes (670 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Mount Olive Solar Farm?

Mount Olive Solar Farm is in Morris County, New Jersey, at about 40.881°, -74.699°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Morris County goes 14 hours a year without power, the 4th most of 21 counties in New Jersey. The county's page has the full outage record.

Who operates Mount Olive Solar Farm?

It is operated by NJR Clean Energy Ventures Corporation (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Mount Olive Solar Farm open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average New Jersey home's 670 kWh a month in 2025. Methodology.