Solar power plant · Morris, NJ

Parker Road Solar

Parker Road Solar is a 15 MW solar power plant in Morris County, New Jersey, operated by NJR Clean Energy Ventures Corporation. Its oldest generator still running came online in 2025. In 2025 it generated 6.6 GWh, about what 821 average New Jersey homes use in a year.

Capacity15 MWNameplate, September 2026
Generated6.6 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Parker Road Solar in context

Among the 352 solar plants in New Jersey in the EIA's inventory, it is the 9th largest, about 1.2% of the state's 1.3 GW of solar capacity.

Morris County has 17 power plants of 1 MW or more with 71 MW in all; Parker Road Solar is 22% of that and the 2nd largest of 15 solar plants there.

The average electricity customer in Morris County goes 14 hours a year without power, the 4th most of 21 counties in New Jersey. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Parker Road Solar (outlined) and other plants in Morris County, shaded. 40.768, -74.735.

Plant facts

Operator
NJR Clean Energy Ventures Corporation
Sector
IPP Non-CHP
Grid operator
PJM
County
Morris County, NJ
EIA plant ID
68681
Where New Jersey's power comes from → New Jersey power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PKRRD Solar Photovoltaic 15 MW 2025 –

Nearby

Other plants in Morris County

Mount Olive Solar Farm · 20 MWMorristown Medical Center · 4.6 MWToys R Us- DE, Inc. at Mt. Olive, NJ · 4.1 MWNorth Jersey Media Group Solar Facility · 4.1 MWCounty College of Morris · 2.9 MWEmerald Kemble, LLC · 2.4 MWCitrine NJ - West Pkwy · 2.3 MWMount Olive Solar 3 LLC · 2.2 MW

Questions

Parker Road Solar, answered

How much power does Parker Road Solar produce?

Parker Road Solar has 15 MW of capacity from one generator. In 2025 it generated 6.6 GWh.

How many homes does Parker Road Solar power?

Its 2025 output of 6.6 GWh equals the yearly electricity use of about 821 average New Jersey homes (670 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Parker Road Solar?

Parker Road Solar is in Morris County, New Jersey, at about 40.768°, -74.735°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Morris County goes 14 hours a year without power, the 4th most of 21 counties in New Jersey. The county's page has the full outage record.

Who operates Parker Road Solar?

It is operated by NJR Clean Energy Ventures Corporation (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Parker Road Solar open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average New Jersey home's 670 kWh a month in 2025. Methodology.