Wind power plant · Fisher, TX
Mozart Wind Farm
Mozart Wind Farm is a 30 MW wind power plant in Fisher County, Texas, operated by Mozart Wind, LLC. Its oldest generator still running came online in 2012. In 2025 it generated 50 GWh, about what 3,700 average Texas homes use in a year.
Mozart Wind Farm in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 218th largest, about 0.1% of the state's 45 GW of wind capacity.
Fisher County has 3 power plants of 1 MW or more with 539 MW in all; Mozart Wind Farm is 6% of that and the 3rd largest of 3 wind plants there.
Its capacity factor of 19% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Fisher County goes 5.6 hours a year without power, the 188th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mozart Wind Farm (outlined) and other plants in Fisher County, shaded. 32.970, -100.524.
Plant facts
- Operator
- Mozart Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Fisher County, TX
- EIA plant ID
- 58048
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 30 MW | 2012 | – |
Nearby
Other plants in Fisher County
Questions
Mozart Wind Farm, answered
How much power does Mozart Wind Farm produce?
Mozart Wind Farm has 30 MW of capacity from one generator. In 2025 it generated 50 GWh, 19% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mozart Wind Farm power?
Its 2025 output of 50 GWh equals the yearly electricity use of about 3,700 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mozart Wind Farm?
Mozart Wind Farm is in Fisher County, Texas, at about 32.970°, -100.524°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Fisher County goes 5.6 hours a year without power, the 188th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Mozart Wind Farm?
It is operated by Mozart Wind, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Mozart Wind Farm open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.