Wind power plant · Fisher, TX
Pyron Wind Farm LLC Hybrid
Pyron Wind Farm LLC Hybrid is a 259 MW wind power plant in Fisher County, Texas, operated by RWE Americas, LLC. Its oldest generator still running came online in 2009. In 2025 it generated 940 GWh, about what 71,000 average Texas homes use in a year.
Pyron Wind Farm LLC Hybrid in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 46th largest, about 0.6% of the state's 45 GW of wind capacity.
Fisher County has 3 power plants of 1 MW or more with 539 MW in all; Pyron Wind Farm LLC Hybrid is 48% of that and the largest of 3 wind plants there.
Its capacity factor of 42% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Fisher County goes 5.6 hours a year without power, the 188th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pyron Wind Farm LLC Hybrid (outlined) and other plants in Fisher County, shaded. 32.589, -100.673.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Fisher County, TX
- EIA plant ID
- 56981
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 249 MW | 2009 | – |
| PYRBT | Batteries | 9.9 MW · 10 MWh | 2018 | – |
Nearby
Other plants in Fisher County
Questions
Pyron Wind Farm LLC Hybrid, answered
How much power does Pyron Wind Farm LLC Hybrid produce?
Pyron Wind Farm LLC Hybrid has 259 MW of capacity from 2 generators. In 2025 it generated 940 GWh, 42% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pyron Wind Farm LLC Hybrid power?
Its 2025 output of 940 GWh equals the yearly electricity use of about 71,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pyron Wind Farm LLC Hybrid?
Pyron Wind Farm LLC Hybrid is in Fisher County, Texas, at about 32.589°, -100.673°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Fisher County goes 5.6 hours a year without power, the 188th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Pyron Wind Farm LLC Hybrid?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Pyron Wind Farm LLC Hybrid open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.