Nobles 2 Wind Project is a 250 MW wind power plant in Nobles County, Minnesota, operated by Nobles 2 Power Partners, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 974 GWh, about what 109,000 average Minnesota homes use in a year.
Nobles 2 Wind Project in context
Among the 122 wind plants in Minnesota in the EIA's inventory, it is the largest, about 5.0% of the state's 5.0 GW of wind capacity.
Nobles County has 10 power plants of 1 MW or more with 509 MW in all; Nobles 2 Wind Project is 49% of that and the largest of 8 wind plants there.
Its capacity factor of 45% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Nobles County goes 1.9 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Nobles 2 Wind Project (outlined) and other plants in Nobles County, shaded. 43.790, -95.853.
Plant facts
- Operator
- Nobles 2 Power Partners, LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Nobles County, MN
- EIA plant ID
- 62364
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | 250 MW | 2020 | – |
Nearby
Other plants in Nobles County
Questions
Nobles 2 Wind Project, answered
How much power does Nobles 2 Wind Project produce?
Nobles 2 Wind Project has 250 MW of capacity from one generator. In 2025 it generated 974 GWh, 45% of the most it could have made running flat out all year (its capacity factor).
How many homes does Nobles 2 Wind Project power?
Its 2025 output of 974 GWh equals the yearly electricity use of about 109,000 average Minnesota homes (743 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Nobles 2 Wind Project?
Nobles 2 Wind Project is in Nobles County, Minnesota, at about 43.790°, -95.853°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Nobles County goes 1.9 hours a year without power. The county's page has the full outage record.
Who operates Nobles 2 Wind Project?
It is operated by Nobles 2 Power Partners, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Nobles 2 Wind Project open?
Its oldest generator still running came online in 2020.