Storage power plant · Washington, AR
Noland Wastewater Treatment Plant Hybrid
Noland Wastewater Treatment Plant Hybrid is a 11 MW storage power plant in Washington County, Arkansas, operated by Today's Power, Inc.. Its oldest generator still running came online in 2019. In 2025 it generated 4.1 GWh, about what 318 average Arkansas homes use in a year.
Noland Wastewater Treatment Plant Hybrid in context
Among the 4 storage plants in Arkansas in the EIA's inventory, it is the largest, about 35% of the state's 31 MW of storage capacity.
Washington County has 10 power plants of 1 MW or more with 454 MW in all; Noland Wastewater Treatment Plant Hybrid is 2% of that and the largest of 2 storage plants there.
The average electricity customer in Washington County goes 2.5 hours a year without power, the 70th most of 73 counties in Arkansas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Noland Wastewater Treatment Plant Hybrid (outlined) and other plants in Washington County, shaded. 36.082, -94.067.
Plant facts
- Operator
- Today's Power, Inc.
- Sector
- Commercial Non-CHP
- Grid operator
- SWPP
- County
- Washington County, AR
- EIA plant ID
- 62682
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| FAYEB | Batteries | 6.0 MW · 13 MWh | 2019 | – |
| FAYE1 | Solar Photovoltaic | 5.0 MW | 2019 | – |
Nearby
Other plants in Washington County
Questions
Noland Wastewater Treatment Plant Hybrid, answered
How much can Noland Wastewater Treatment Plant Hybrid store and deliver?
Noland Wastewater Treatment Plant Hybrid can deliver up to 11 MW and hold 13 MWh of energy, from 2 storage units. Its net energy in 2025 was 4.1 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Noland Wastewater Treatment Plant Hybrid?
Noland Wastewater Treatment Plant Hybrid is in Washington County, Arkansas, at about 36.082°, -94.067°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Washington County goes 2.5 hours a year without power, the 70th most of 73 counties in Arkansas. The county's page has the full outage record.
Who operates Noland Wastewater Treatment Plant Hybrid?
It is operated by Today's Power, Inc. (EIA sector: Commercial Non-CHP), and it feeds the Southwest Power Pool.
When did Noland Wastewater Treatment Plant Hybrid open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Arkansas home's 1,076 kWh a month in 2025. Methodology.