Solar power plant · Hartford, CT

Nutmeg Solar

Nutmeg Solar is a 20 MW solar power plant in Hartford County, Connecticut, operated by Nutmeg Solar LLC. Its oldest generator still running came online in 2020. In 2025 it generated 35 GWh, about what 4,100 average Connecticut homes use in a year.

Capacity20 MWNameplate, September 2026
Generated35 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators1Oldest from 2020

Nutmeg Solar in context

Among the 93 solar plants in Connecticut in the EIA's inventory, it is the 7th largest, about 3.9% of the state's 501 MW of solar capacity.

Hartford County has 44 power plants of 1 MW or more with 409 MW in all; Nutmeg Solar is 5% of that and the 3rd largest of 28 solar plants there.

Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Hartford County goes 3.9 hours a year without power, the 8th most of 8 counties in Connecticut. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01020304050202020212022202320242025GWh 35
0102030405020202021202220232024202535

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Nutmeg Solar (outlined) and other plants in Hartford County, shaded. 41.975, -72.511.

Plant facts

Operator
Nutmeg Solar LLC
Sector
IPP Non-CHP
Grid operator
ISNE
County
Hartford County, CT
EIA plant ID
63592
Where Connecticut's power comes from → Connecticut power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
NUTMG Solar Photovoltaic 20 MW 2020 –

Questions

Nutmeg Solar, answered

How much power does Nutmeg Solar produce?

Nutmeg Solar has 20 MW of capacity from one generator. In 2025 it generated 35 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Nutmeg Solar power?

Its 2025 output of 35 GWh equals the yearly electricity use of about 4,100 average Connecticut homes (704 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Nutmeg Solar?

Nutmeg Solar is in Hartford County, Connecticut, at about 41.975°, -72.511°. It is one of 44 power plants of 1 MW or more in the county. The average electricity customer in Hartford County goes 3.9 hours a year without power, the 8th most of 8 counties in Connecticut. The county's page has the full outage record.

Who operates Nutmeg Solar?

It is operated by Nutmeg Solar LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.

When did Nutmeg Solar open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Connecticut home's 704 kWh a month in 2025. Methodology.