Where the power comes from · 2025
Connecticut
Natural gas made 56% of the electricity generated in Connecticut in 2025, the 9th highest natural gas share of any state. In 2005, coal made 12% of it; in 2025, 0%.
The mix
Connecticut's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
Connecticut's power plants
186 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in Connecticut, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
Connecticut's power plants emitted 246 kg of CO₂ for each MWh they generated in 2024, against 348 kg in 2005: the 12th lowest of 51. 11 million metric tons in all.
Connecticut among the states
- Generation43.8 TWh34th
- Renewable share4%51st
- Carbon-free share42%28th
- Cleanest electricity (kg CO₂/MWh, 2024)24612th
- Natural gas share56%9th
- Nuclear share38%7th
- Other share3.1%14th
- Solar share1.5%39th
More on Connecticut
Power outage history → Rooftop solar and home batteries → Average electric bills →Plants
The largest plants in Connecticut
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| Millstone | Nuclear | New London | 2.3 GW | 17 TWh | 84% | 1975 |
| CPV Towantic Energy Center | Natural gas | New Haven | 842 MW | 4.8 TWh | 65% | 2018 |
| Lake Road Generating Plant | Natural gas | Windham | 840 MW | 5.8 TWh | 79% | 2002 |
| Middletown | Oil | Middlesex | 786 MW | 87 GWh | 1% | 1958 |
| Kleen Energy Systems | Natural gas | Middlesex | 693 MW | 3.2 TWh | 53% | 2011 |
| New Haven Steam | Oil | New Haven | 642 MW | 106 GWh | 2% | 1975 |
| Milford Power Project | Natural gas | New Haven | 578 MW | 3.4 TWh | 67% | 2004 |
| Bridgeport Station | Natural gas | Fairfield | 576 MW | 3.4 TWh | 67% | 2019 |
| Bridgeport Energy Project | Natural gas | Fairfield | 520 MW | 2.4 TWh | 53% | 1998 |
| Montville Station | Oil | New London | 495 MW | 133 GWh | 3% | 1954 |
| Wallingford Energy | Natural gas | New Haven | 350 MW | 107 GWh | 4% | 2001 |
| GenConn Middletown LLC | Oil | Middlesex | 242 MW | 6.5 GWh | 0% | 2011 |
| GenConn Devon LLC | Oil | New Haven | 242 MW | 15 GWh | 1% | 2010 |
| Devon Station | Oil | New Haven | 223 MW | -1.4 GWh | – | 1985 |
| Gravel Pit Solar, LLC | Solar | Hartford | 120 MW | 147 GWh | – | 2025 |
| Cos Cob | Oil | Fairfield | 115 MW | 1.6 GWh | 0% | 1969 |
| Waterbury Generation | Natural gas | New Haven | 96 MW | 55 GWh | 7% | 2009 |
| A L Pierce | Natural gas | New Haven | 84 MW | 0.0 GWh | – | 2007 |
| Algonquin Windsor Locks | Natural gas | Hartford | 71 MW | 138 GWh | 22% | 1990 |
| Waterside Power, LLC | Oil | Fairfield | 70 MW | 2.0 GWh | 0% | 2004 |
| Wheelabrator Bridgeport | Biomass | Fairfield | 67 MW | 471 GWh | 80% | 1988 |
| Quinebaug Solar | Solar | Windham | 49 MW | 79 GWh | 18% | 2021 |
| Plainfield Renewable Energy LLC | Biomass | Windham | 43 MW | 245 GWh | 65% | 2013 |
| Pfizer Groton Plant | Natural gas | New London | 38 MW | 75 GWh | 23% | 1952 |
| Shepaug | Hydro | New Haven | 37 MW | 93 GWh | 29% | 1955 |
| DWW Solar ll | Solar | Hartford | 37 MW | 46 GWh | 14% | 2019 |
| Kimberly Clark-Unit 1,2,3 | Natural gas | Litchfield | 36 MW | 233 GWh | 73% | 2008 |
| Rocky River (CT) | Storage | Litchfield | 31 MW | -2.4 GWh | – | 1928 |
| Stevenson | Hydro | Fairfield | 31 MW | 71 GWh | 27% | 1919 |
| Pratt & Whitney | Natural gas | Hartford | 26 MW | 66 GWh | 29% | 1992 |
| UCONN Cogen Facility | Natural gas | Tolland | 26 MW | 111 GWh | 49% | 2006 |
| Branford | Oil | New Haven | 22 MW | 0.3 GWh | 0% | 1967 |
| Franklin Drive | Oil | Litchfield | 22 MW | 0.3 GWh | 0% | 1968 |
| Torrington | Oil | Litchfield | 22 MW | 0.3 GWh | 0% | 1967 |
| Tunnel | Oil | New London | 21 MW | 5.9 GWh | 3% | 1919 |
| Fusion Solar Center LLC | Solar | New London | 20 MW | 39 GWh | 22% | 2018 |
| Woods Hill Solar | Solar | Windham | 20 MW | 24 GWh | 14% | 2018 |
| SR Litchfield | Solar | Litchfield | 20 MW | 26 GWh | – | 2025 |
| Nutmeg Solar | Solar | Hartford | 20 MW | 35 GWh | 20% | 2020 |
| Covanta Southeastern Connecticut Company | Biomass | New London | 18 MW | 116 GWh | 73% | 1991 |
| Bridgeport Fuel Cell, LLC | Natural gas | Fairfield | 17 MW | 90 GWh | 62% | 2013 |
| Rand Whitney CHP Plant | Natural gas | New London | 17 MW | 133 GWh | 92% | 2005 |
| Covanta Bristol Energy | Biomass | Hartford | 16 MW | 109 GWh | 77% | 1987 |
| Foxwoods CoGen | Natural gas | New London | 16 MW | 11 GWh | 8% | 2010 |
| Wallingford Solar | Solar | New Haven | 16 MW | 15 GWh | 11% | 2021 |
| North Stonington Solar Center, LLC | Solar | New London | 15 MW | 32 GWh | 24% | 2022 |
| Wheelabrator Lisbon | Biomass | New London | 15 MW | 100 GWh | 78% | 1995 |
| Derby Fuel Cell | Natural gas | New Haven | 14 MW | 110 GWh | 90% | 2024 |
| SR North Stonington | Solar | New London | 12 MW | 15 GWh | 14% | 2024 |
| Hartford Hospital Cogeneration | Natural gas | Hartford | 12 MW | 49 GWh | 48% | 1988 |
| Fort Hill 1, 2, 3 & 4 | Oil | New London | 10 MW | 0.6 GWh | 1% | 2010 |
| Backus Microgrid Project | Oil | New London | 10 MW | 0.6 GWh | 1% | 2014 |
| Stamford Health | Oil | Fairfield | 10 MW | -43.3 GWh | – | 1984 |
| Generate Colchester Fuel Cells, LLC | Natural gas | New London | 10 MW | 72 GWh | 83% | 2021 |
| Sikorsky Aircraft CHP | Natural gas | Fairfield | 9.9 MW | 65 GWh | 75% | 2010 |
| Falls Village | Hydro | Litchfield | 9.0 MW | 26 GWh | 33% | 1914 |
| Derby Hydro | Hydro | Fairfield | 8.6 MW | 23 GWh | 30% | 1989 |
| Rainbow (CT) | Hydro | Hartford | 8.0 MW | 21 GWh | 30% | 1925 |
| Subase Microgrid Project | Natural gas | New London | 7.4 MW | 30 GWh | 46% | 2022 |
| Naval Sub Base New London Fuel Cell | Natural gas | New London | 7.4 MW | 30 GWh | 46% | 2022 |
| Bulls Bridge | Hydro | Litchfield | 7.2 MW | 27 GWh | 43% | 1903 |
| Bradley Energy Center | Natural gas | Hartford | 5.8 MW | 11 GWh | 22% | 2002 |
| Pfizer Groton Fuel Cell | Natural gas | New London | 5.6 MW | 36 GWh | 74% | 2016 |
| Bridge Street 1 & 2 | Oil | New London | 5.2 MW | 0.5 GWh | 1% | 2010 |
| Gary Court 1 & 2 | Oil | New London | 5.2 MW | 0.4 GWh | 1% | 2010 |
| LNG 1 & 2 | Oil | New London | 5.2 MW | 0.4 GWh | 1% | 2010 |
| Lebanon Pines 1 & 2 | Oil | New London | 5.2 MW | 0.4 GWh | 1% | 2010 |
| Water Treatment 1 & 2 | Oil | New London | 5.2 MW | 0.4 GWh | 1% | 2010 |
| Somers Solar Center, LLC | Solar | Tolland | 5.0 MW | 8.9 GWh | 20% | 2013 |
| UI RCP Bridgeport Seaside | Natural gas | Fairfield | 5.0 MW | 19 GWh | 44% | 2015 |
| Wind Colebrook South | Wind | Litchfield | 5.0 MW | 12 GWh | 28% | 2015 |
| South Windsor Fuel Cell | Natural gas | Hartford | 5.0 MW | 37 GWh | 85% | 2020 |
| East Windsor Solar One | Solar | Hartford | 5.0 MW | 4.4 GWh | 10% | 2021 |
| North Franklin Solar | Solar | New London | 5.0 MW | 0.0 GWh | – | 2025 |
| Southington Solar One | Solar | Hartford | 4.7 MW | 9.1 GWh | 22% | 2022 |
| Frito Lay Incorporated | Natural gas | Windham | 4.6 MW | 25 GWh | 62% | 2009 |
| Fairfield University CHP Plant | Natural gas | Fairfield | 4.5 MW | 23 GWh | 59% | 2007 |
| Danbury Hospital Cogen Plant | Natural gas | Fairfield | 4.3 MW | 22 GWh | 57% | 2011 |
| CMEEC - Polaris Park Solar Hybrid | Solar | New London | 4.3 MW | 4.5 GWh | 12% | 2017 |
| CMEEC - Norwich Stott St Solar Hybrid | Solar | New London | 4.3 MW | 3.6 GWh | 10% | 2016 |
| HSCo CHP | Natural gas | Hartford | 4.0 MW | 28 GWh | 79% | 2009 |
| Antares-GRE 314 East Lyme LLC | Solar | New London | 4.0 MW | 4.7 GWh | 13% | 2014 |
| Enfield Solar One | Solar | Hartford | 4.0 MW | 8.3 GWh | 24% | 2024 |
| East Windsor Solar Two | Solar | Hartford | 4.0 MW | 0.7 GWh | – | 2025 |
| Norfolk Landfill Solar Project | Solar | Litchfield | 4.0 MW | 5.6 GWh | 16% | 2024 |
| Raffia Road Solar Project | Solar | Hartford | 4.0 MW | 7.0 GWh | 20% | 2024 |
| East Windsor | Solar | Hartford | 4.0 MW | 0.9 GWh | – | 2025 |
| Stafford Solar One | Solar | Tolland | 4.0 MW | – | – | 2026 |
| Amazon BDL4 | Solar | Hartford | 3.9 MW | 3.7 GWh | – | 2025 |
| TRS Fuel Cell | Natural gas | Fairfield | 3.7 MW | 0.0 GWh | – | 2019 |
| CCSU Co-Gen-STBY Gen | Natural gas | Hartford | 3.6 MW | 0.0 GWh | – | 1993 |
| Burlington Solar 1 | Solar | Hartford | 3.5 MW | 5.8 GWh | 19% | 2022 |
| UDR Glastonbury Fuel Cell | Natural gas | Hartford | 3.4 MW | 16 GWh | 53% | 2016 |
| Brass Mill Center | Solar | New Haven | 3.4 MW | – | – | 2017 |
| Goodwin Hydroelectric | Hydro | Hartford | 3.2 MW | 6.9 GWh | 25% | 1986 |
| Cellu Tissue | Natural gas | Hartford | 3.0 MW | 11 GWh | 41% | 2009 |
| Town of Rocky Hill PV CSG | Solar | Hartford | 3.0 MW | 5.0 GWh | 19% | 2018 |
| Bristol Solar One, LLC | Solar | Hartford | 3.0 MW | 4.9 GWh | 19% | 2021 |
| Woodstock Solar One | Solar | Windham | 3.0 MW | – | – | 2026 |
| Glastonbury Solar One | Solar | Hartford | 3.0 MW | 0.8 GWh | – | 2025 |
Coming next
Planned projects
The largest generators reported as planned in Connecticut, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Elevate Middletown | Storage | Middlesex | 275 MW | 2027 |
| Broadleaf Solar | Solar | Hartford | 200 MW | 2028 |
| Pure Hedge LLC | Solar | Windham | 70 MW | 2027 |
| KCE CT 1, LLC | Storage | Windham | 45 MW | 2031 |
| Pure Hedge LLC | Storage | Windham | 20 MW | 2027 |
| Groton Flanders Road Landfill | Solar | New London | 5.0 MW | 2027 |
| Putnam Meadow Solar Station | Solar | Windham | 4.0 MW | 2027 |
| Plainfield Solar One | Solar | Windham | 4.0 MW | 2027 |
| CT Airport Authority Solar One | Solar | Hartford | 4.0 MW | 2027 |
| Willington Solar One, LLC | Solar | Tolland | 2.0 MW | 2027 |
| Windsor Locks | Solar | Hartford | 1.8 MW | 2026 |
Shut down
Retired since 2010
The largest generators retired in Connecticut since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| Bridgeport Station | Coal | 400 MW | 2021 |
| AES Thames | Coal | 214 MW | 2012 |
| NRG Norwalk Harbor | Oil | 163 MW | 2013 |
| NRG Norwalk Harbor | Oil | 163 MW | 2013 |
| Bridgeport Station | Oil | 163 MW | 2014 |
| CT Resource Rec Authority Facility | Biomass | 45 MW | 2022 |
| CT Resource Rec Authority Facility | Biomass | 45 MW | 2022 |
| South Meadow | Oil | 42 MW | 2023 |
| South Meadow | Oil | 42 MW | 2023 |
| South Meadow | Oil | 42 MW | 2023 |
| South Meadow | Oil | 42 MW | 2023 |
| Capitol District Energy Center | Natural gas | 40 MW | 2021 |
| Pure Hedge LLC | Other | 31 MW | 2017 |
| Capitol District Energy Center | Natural gas | 31 MW | 2021 |
| Versailles Mill | Natural gas | 20 MW | 2014 |
| North Main Street | Oil | 19 MW | 2023 |
| Bridgeport Station | Oil | 19 MW | 2021 |
| NRG Norwalk Harbor | Oil | 16 MW | 2013 |
| Covanta Wallingford Energy | Biomass | 11 MW | 2015 |
| Bristol Myers Squibb Wallingford | Natural gas | 4.8 MW | 2018 |
| Norwalk Hospital Plant | Natural gas | 3.0 MW | 2025 |
| Uncasville Mill | Natural gas | 2.8 MW | 2016 |
| Pfizer Groton Plant | Natural gas | 2.5 MW | 2015 |
| Norden 1-3 | Oil | 2.0 MW | 2025 |
| Norden 1-3 | Oil | 2.0 MW | 2025 |
| Norden 1-3 | Oil | 2.0 MW | 2025 |
| Digital Fairfield | Natural gas | 2.0 MW | 2024 |
| Bristol Myers Squibb Wallingford | Oil | 2.0 MW | 2018 |
| John Street 1, 3, 4 & 5 | Oil | 1.8 MW | 2018 |
| John Street 1, 3, 4 & 5 | Oil | 1.8 MW | 2018 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.