Oil power plant · New London, CT
Tunnel
Tunnel is a 21 MW oil power plant in New London County, Connecticut, operated by FirstLight Power Resources Services LLC. Its oldest generator still running came online in 1919. In 2025 it generated 5.9 GWh, about what 698 average Connecticut homes use in a year.
Tunnel in context
Among the 29 other-fuel plants in Connecticut in the EIA's inventory, it is the 14th largest, about 0.7% of the state's 3.1 GW of other-fuel capacity.
New London County has 45 power plants of 1 MW or more with 3.0 GW in all; Tunnel is 1% of that and the 2nd largest of 13 oil plants there.
Its capacity factor of 3% in 2025 is lower than the 25% typical for oil plants across the US.
The average electricity customer in New London County goes 9.2 hours a year without power, the 5th most of 8 counties in Connecticut. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Tunnel (outlined) and other plants in New London County, shaded. 41.555, -72.042.
Plant facts
- Operator
- FirstLight Power Resources Services LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- New London County, CT
- EIA plant ID
- 557
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 10 | Petroleum Liquids | 19 MW | 1969 | – |
| 1 | Conventional Hydroelectric | 1.0 MW | 1919 | – |
| 2 | Conventional Hydroelectric | 1.0 MW | 1949 | – |
Questions
Tunnel, answered
How much power does Tunnel produce?
Tunnel has 21 MW of capacity from 3 generators. In 2025 it generated 5.9 GWh, 3% of the most it could have made running flat out all year (its capacity factor).
How many homes does Tunnel power?
Its 2025 output of 5.9 GWh equals the yearly electricity use of about 698 average Connecticut homes (704 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Tunnel?
Tunnel is in New London County, Connecticut, at about 41.555°, -72.042°. It is one of 45 power plants of 1 MW or more in the county. The average electricity customer in New London County goes 9.2 hours a year without power, the 5th most of 8 counties in Connecticut. The county's page has the full outage record.
Who operates Tunnel?
It is operated by FirstLight Power Resources Services LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Tunnel open?
Its oldest generator still running came online in 1919.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Connecticut home's 704 kWh a month in 2025. Methodology.