Hydro power plant · Fairfield, CT
Stevenson
Stevenson is a 31 MW hydro power plant in Fairfield County, Connecticut, operated by FirstLight Power Resources Services LLC. Its oldest generator still running came online in 1919. In 2025 it generated 71 GWh, about what 8,400 average Connecticut homes use in a year.
Stevenson in context
Among the 13 hydro plants in Connecticut in the EIA's inventory, it is the 2nd largest, about 26% of the state's 116 MW of hydro capacity.
Fairfield County has 17 power plants of 1 MW or more with 1.4 GW in all; Stevenson is 2% of that and the largest of 2 hydro plants there.
Its capacity factor of 27% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Fairfield County goes 11 hours a year without power, the 3rd most of 8 counties in Connecticut. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Stevenson (outlined) and other plants in Fairfield County, shaded. 41.383, -73.171.
Plant facts
- Operator
- FirstLight Power Resources Services LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Fairfield County, CT
- EIA plant ID
- 553
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 4 | Conventional Hydroelectric | 8.0 MW | 1936 | – |
| 1 | Conventional Hydroelectric | 7.5 MW | 1919 | – |
| 2 | Conventional Hydroelectric | 7.5 MW | 1919 | – |
| 3 | Conventional Hydroelectric | 7.5 MW | 1919 | – |
Nearby
Other plants in Fairfield County
Questions
Stevenson, answered
How much power does Stevenson produce?
Stevenson has 31 MW of capacity from 4 generators. In 2025 it generated 71 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Stevenson power?
Its 2025 output of 71 GWh equals the yearly electricity use of about 8,400 average Connecticut homes (704 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Stevenson?
Stevenson is in Fairfield County, Connecticut, at about 41.383°, -73.171°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Fairfield County goes 11 hours a year without power, the 3rd most of 8 counties in Connecticut. The county's page has the full outage record.
Who operates Stevenson?
It is operated by FirstLight Power Resources Services LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Stevenson open?
Its oldest generator still running came online in 1919.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Connecticut home's 704 kWh a month in 2025. Methodology.