Natural gas power plant · New Haven, CT

CPV Towantic Energy Center

CPV Towantic Energy Center is a 842 MW natural gas power plant in New Haven County, Connecticut, operated by CPV Towantic, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 4.8 TWh, about what 570,000 average Connecticut homes use in a year.

Capacity842 MWNameplate, September 2026
Generated4.8 TWhIn 2025
Capacity factor65%Share of the most it could make, 2025
Generators3Oldest from 2018

CPV Towantic Energy Center in context

Among the 48 natural gas plants in Connecticut in the EIA's inventory, it is the largest, about 17% of the state's 5.0 GW of natural gas capacity.

New Haven County has 27 power plants of 1 MW or more with 3.2 GW in all; CPV Towantic Energy Center is 27% of that and the largest of 10 natural gas plants there.

Its capacity factor of 65% in 2025 is higher than the 23% typical for natural gas plants across the US.

The average electricity customer in New Haven County goes 5.7 hours a year without power, the 7th most of 8 counties in Connecticut. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02,0004,0006,0008,00020182019202020212022202320242025GWh 4,813
02,0004,0006,0008,00020192021202320254,813

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

CPV Towantic Energy Center (outlined) and other plants in New Haven County, shaded. 41.481, -73.123.

Plant facts

Operator
CPV Towantic, LLC
Sector
IPP Non-CHP
Grid operator
ISNE
County
New Haven County, CT
EIA plant ID
56047
Where Connecticut's power comes from → Connecticut power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CTG1 Natural Gas Fired Combined Cycle 281 MW 2018 –
CTG2 Natural Gas Fired Combined Cycle 281 MW 2018 –
STG Natural Gas Fired Combined Cycle 281 MW 2018 –

Questions

CPV Towantic Energy Center, answered

How much power does CPV Towantic Energy Center produce?

CPV Towantic Energy Center has 842 MW of capacity from 3 generators. In 2025 it generated 4.8 TWh, 65% of the most it could have made running flat out all year (its capacity factor).

How many homes does CPV Towantic Energy Center power?

Its 2025 output of 4.8 TWh equals the yearly electricity use of about 570,000 average Connecticut homes (704 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is CPV Towantic Energy Center?

CPV Towantic Energy Center is in New Haven County, Connecticut, at about 41.481°, -73.123°. It is one of 27 power plants of 1 MW or more in the county. The average electricity customer in New Haven County goes 5.7 hours a year without power, the 7th most of 8 counties in Connecticut. The county's page has the full outage record.

Who operates CPV Towantic Energy Center?

It is operated by CPV Towantic, LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.

When did CPV Towantic Energy Center open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Connecticut home's 704 kWh a month in 2025. Methodology.