Natural gas power plant · New London, CT
Generate Colchester Fuel Cells, LLC
Generate Colchester Fuel Cells, LLC is a 10 MW natural gas power plant in New London County, Connecticut, operated by Generate Colchester Fuel Cells, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 72 GWh, about what 8,600 average Connecticut homes use in a year.
Generate Colchester Fuel Cells, LLC in context
Among the 48 natural gas plants in Connecticut in the EIA's inventory, it is the 20th largest, about 0.2% of the state's 5.0 GW of natural gas capacity.
New London County has 45 power plants of 1 MW or more with 3.0 GW in all; Generate Colchester Fuel Cells, LLC is 0% of that and the 4th largest of 9 natural gas plants there.
Its capacity factor of 83% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in New London County goes 9.2 hours a year without power, the 5th most of 8 counties in Connecticut. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Generate Colchester Fuel Cells, LLC (outlined) and other plants in New London County, shaded. 41.594, -72.331.
Plant facts
- Operator
- Generate Colchester Fuel Cells, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- New London County, CT
- EIA plant ID
- 66053
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GCFC | Other Natural Gas | 10 MW | 2021 | – |
Questions
Generate Colchester Fuel Cells, LLC, answered
How much power does Generate Colchester Fuel Cells, LLC produce?
Generate Colchester Fuel Cells, LLC has 10 MW of capacity from one generator. In 2025 it generated 72 GWh, 83% of the most it could have made running flat out all year (its capacity factor).
How many homes does Generate Colchester Fuel Cells, LLC power?
Its 2025 output of 72 GWh equals the yearly electricity use of about 8,600 average Connecticut homes (704 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Generate Colchester Fuel Cells, LLC?
Generate Colchester Fuel Cells, LLC is in New London County, Connecticut, at about 41.594°, -72.331°. It is one of 45 power plants of 1 MW or more in the county. The average electricity customer in New London County goes 9.2 hours a year without power, the 5th most of 8 counties in Connecticut. The county's page has the full outage record.
Who operates Generate Colchester Fuel Cells, LLC?
It is operated by Generate Colchester Fuel Cells, LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Generate Colchester Fuel Cells, LLC open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Connecticut home's 704 kWh a month in 2025. Methodology.