Solar power plant · Saratoga, NY
NY8 - ELP Stillwater Solar
NY8 - ELP Stillwater Solar is a 20 MW solar power plant in Saratoga County, New York, operated by MN8 Energy LLC. Its oldest generator still running came online in 2023. In 2025 it generated 33 GWh, about what 4,700 average New York homes use in a year.
NY8 - ELP Stillwater Solar in context
Among the 730 solar plants in New York in the EIA's inventory, it is the 17th largest, about 0.6% of the state's 3.2 GW of solar capacity.
Saratoga County has 38 power plants of 1 MW or more with 582 MW in all; NY8 - ELP Stillwater Solar is 3% of that and the largest of 20 solar plants there.
Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Saratoga County goes 9.1 hours a year without power, the 23rd most of 62 counties in New York. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
NY8 - ELP Stillwater Solar (outlined) and other plants in Saratoga County, shaded. 42.926, -73.711.
Plant facts
- Operator
- MN8 Energy LLC
- Sector
- IPP Non-CHP
- Grid operator
- NYIS
- County
- Saratoga County, NY
- EIA plant ID
- 65841
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | 20 MW | 2023 | – |
Questions
NY8 - ELP Stillwater Solar, answered
How much power does NY8 - ELP Stillwater Solar produce?
NY8 - ELP Stillwater Solar has 20 MW of capacity from one generator. In 2025 it generated 33 GWh, 19% of the most it could have made running flat out all year (its capacity factor).
How many homes does NY8 - ELP Stillwater Solar power?
Its 2025 output of 33 GWh equals the yearly electricity use of about 4,700 average New York homes (586 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is NY8 - ELP Stillwater Solar?
NY8 - ELP Stillwater Solar is in Saratoga County, New York, at about 42.926°, -73.711°. It is one of 38 power plants of 1 MW or more in the county. The average electricity customer in Saratoga County goes 9.1 hours a year without power, the 23rd most of 62 counties in New York. The county's page has the full outage record.
Who operates NY8 - ELP Stillwater Solar?
It is operated by MN8 Energy LLC (EIA sector: IPP Non-CHP), and it feeds the New York ISO.
When did NY8 - ELP Stillwater Solar open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average New York home's 586 kWh a month in 2025. Methodology.