Hydro power plant · Saratoga, NY
Spier Falls
Spier Falls is a 56 MW hydro power plant in Saratoga County, New York, operated by Erie Boulevard Hydropower LP. Its oldest generator still running came online in 1924.
Spier Falls in context
Among the 163 hydro plants in New York in the EIA's inventory, it is the 4th largest, about 1.2% of the state's 4.7 GW of hydro capacity.
Saratoga County has 38 power plants of 1 MW or more with 582 MW in all; Spier Falls is 10% of that and the 2nd largest of 16 hydro plants there.
The average electricity customer in Saratoga County goes 9.1 hours a year without power, the 23rd most of 62 counties in New York. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Where it is
Spier Falls (outlined) and other plants in Saratoga County, shaded. 43.234, -73.756.
Plant facts
- Operator
- Erie Boulevard Hydropower LP
- Sector
- IPP Non-CHP
- Grid operator
- NYIS
- County
- Saratoga County, NY
- EIA plant ID
- 2612
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 9 | Conventional Hydroelectric | 47 MW | 1930 | – |
| 8 | Conventional Hydroelectric | 9.0 MW | 1924 | – |
Questions
Spier Falls, answered
How much power does Spier Falls produce?
Spier Falls has 56 MW of capacity from 2 generators. No full year of generation is reported yet.
Where is Spier Falls?
Spier Falls is in Saratoga County, New York, at about 43.234°, -73.756°. It is one of 38 power plants of 1 MW or more in the county. The average electricity customer in Saratoga County goes 9.1 hours a year without power, the 23rd most of 62 counties in New York. The county's page has the full outage record.
Who operates Spier Falls?
It is operated by Erie Boulevard Hydropower LP (EIA sector: IPP Non-CHP), and it feeds the New York ISO.
When did Spier Falls open?
Its oldest generator still running came online in 1924.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Methodology.