Wind power plant · Floyd, TX

Old Settler Wind

Old Settler Wind is a 151 MW wind power plant in Floyd County, Texas, operated by Old Settler Wind, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 544 GWh, about what 41,000 average Texas homes use in a year.

Capacity151 MWNameplate, September 2026
Generated544 GWhIn 2025
Capacity factor41%Share of the most it could make, 2025
Generators1Oldest from 2017

Old Settler Wind in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 146th largest, about 0.3% of the state's 45 GW of wind capacity.

Floyd County has 5 power plants of 1 MW or more with 761 MW in all; Old Settler Wind is 20% of that and the 3rd largest of 5 wind plants there.

Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Floyd County goes 6.7 hours a year without power, the 173rd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 544
02004006008002019202120232025544

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Old Settler Wind (outlined) and other plants in Floyd County, shaded. 34.060, -101.188.

Plant facts

Operator
Old Settler Wind, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Floyd County, TX
EIA plant ID
60366
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
OSWF Onshore Wind Turbine 151 MW 2017 –

Questions

Old Settler Wind, answered

How much power does Old Settler Wind produce?

Old Settler Wind has 151 MW of capacity from one generator. In 2025 it generated 544 GWh, 41% of the most it could have made running flat out all year (its capacity factor).

How many homes does Old Settler Wind power?

Its 2025 output of 544 GWh equals the yearly electricity use of about 41,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Old Settler Wind?

Old Settler Wind is in Floyd County, Texas, at about 34.060°, -101.188°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Floyd County goes 6.7 hours a year without power, the 173rd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Old Settler Wind?

It is operated by Old Settler Wind, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Old Settler Wind open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.