Storage power plant · Bexar, TX

Padua 1

Padua 1 is a 50 MW storage power plant in Bexar County, Texas, operated by Padua 1. Its oldest generator still running came online in 2025.

Capacity50 MWNameplate, September 2026
Net energy-2.7 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Padua 1 in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 101st largest, about 0.3% of the state's 16 GW of storage capacity.

Bexar County has 26 power plants of 1 MW or more with 5.0 GW in all; Padua 1 is 1% of that and the 4th largest of 7 storage plants there.

The average electricity customer in Bexar County goes 3.3 hours a year without power, the 219th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Padua 1 (outlined) and other plants in Bexar County, shaded. 29.325, -98.326.

Plant facts

Operator
Padua 1
Sector
IPP Non-CHP
Grid operator
ERCO
County
Bexar County, TX
EIA plant ID
68912
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
12341 Batteries 50 MW · 200 MWh 2025 –

Questions

Padua 1, answered

How much can Padua 1 store and deliver?

Padua 1 can deliver up to 50 MW and hold 200 MWh of energy, from one battery or storage system. Its net energy in 2025 was -2.7 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Padua 1?

Padua 1 is in Bexar County, Texas, at about 29.325°, -98.326°. It is one of 26 power plants of 1 MW or more in the county. The average electricity customer in Bexar County goes 3.3 hours a year without power, the 219th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Padua 1?

It is operated by Padua 1 (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Padua 1 open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.