Storage power plant · Maricopa, AZ
Paloma Solar Hybrid
Paloma Solar Hybrid is a 34 MW storage power plant in Maricopa County, Arizona, operated by Arizona Public Service Co. Its oldest generator still running came online in 2011. In 2025 it generated 30 GWh, about what 2,400 average Arizona homes use in a year.
Paloma Solar Hybrid in context
Among the 41 storage plants in Arizona in the EIA's inventory, it is the 35th largest, about 0.5% of the state's 6.3 GW of storage capacity.
Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Paloma Solar Hybrid is 0% of that and the 19th largest of 21 storage plants there.
The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Paloma Solar Hybrid (outlined) and other plants in Maricopa County, shaded. 33.021, -112.661.
Plant facts
- Operator
- Arizona Public Service Co
- Sector
- Electric Utility
- Grid operator
- AZPS
- County
- Maricopa County, AZ
- EIA plant ID
- 57562
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 17 MW | 2011 | – |
| PA17M | Batteries | 17 MW · 51 MWh | 2023 | – |
Questions
Paloma Solar Hybrid, answered
How much can Paloma Solar Hybrid store and deliver?
Paloma Solar Hybrid can deliver up to 34 MW and hold 51 MWh of energy, from 2 storage units. Its net energy in 2025 was 30 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Paloma Solar Hybrid?
Paloma Solar Hybrid is in Maricopa County, Arizona, at about 33.021°, -112.661°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Paloma Solar Hybrid?
It is operated by Arizona Public Service Co (EIA sector: Electric Utility), and it feeds Arizona Public Service.
When did Paloma Solar Hybrid open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.